GO
Home
+
General
+
GEN-1 Introduction
GEN-1_1 Philosophy
GEN-1_2 Scope/Applicability
GEN-1_3 IDC Layout
GEN-1_4 IDC Availability
GEN-1_5 Statutory Requirements
GEN-1_6 Relationship Between the IDC and Resource
GEN-1_7 Relationship Between the IDC and Building
GEN-1_8 Implementation of the IDC
GEN-1_9 Standards
GEN-1_10 Other Authorities
+
GEN-2 Strategic Alignment
GEN-2_1 General
GEN-2_2 Smartgrowth Strategy and Implementation Pl
GEN-2_3 Smartgrowth's Impact on the IDC
+
GEN-3 Level of Service
GEN-3-1 General
GEN-3-2 Context-Local Government Act 2002
GEN-3-3 How Councils Set Levels of Service
GEN-3-4 Maximums & Minimums
GEN-3-5 Geographical Differences in Levels of Se
GEN-3_6 Zoning and Land Use Differences in Levels
GEN-3-7 WBOPDC Level of Service
GEN-3-8 How to Change Levels of Service
GEN-3_9 Levels of Service and the IDC
+
GEN-4 Definitions
GEN-4_1 General
GEN-4_2 Abbreviations
GEN-4_3 Definitions
+
GEN-5 Document Control & Management
GEN-5_1 General
GEN-5_2 Amendment Processes
GEN-5_3 Advisory Panel
GEN-5_4 Adoption and Delegations
GEN-5_5 Notification
GEN-5_6 Table of Amendments
GEN-5_7 Publication
+
Infrastructure Development Processes
+
ID-1 Infrastructure Development Processes
ID-1_1 General
ID-1_2 Development Works associated with a Resourc
ID-1_3 Other Works not associated with a Resource
ID-1 - Appendix A Process Maps
PD-1 Lifecycle of an Asset Process Map
PD-2 Resource Consent Application Process Map
PD-3 Development Works Approval Process
PD-4 Amendment to DWA Approval
PD-5 Amendment to Approved Development Works Appli
PD-6 s223 Application Process Map
PD-7 s224(c) Application Process Map
PD-8 Approved Materials Process Map
-
Quality Assurance Information Requirements
+
QA_1 Resource Consent Application Requirements
QA-1_1 General
QA-1_2 Development Works
QA-1_3 Development Evaluation Report
QA-1_4 Minimum Information Requirements
QA-1_5 Compilation of the Report
QA-1_6 Drawing Information
QA-1_7 Supporting Documents
QA-1_8 Delivery Media - Digital Data
QA-1_9 Titling Convention
QA-1_10 Peer Review
QA-1 Appendix A Peer Review Requirements
AC_1 Application Checklist Development Evaluation
G1 Producer Statement Suitability of Land for Subd
+
QA-2 Works Undertaken By or For a Council
QA-2_1 General
QA-2_2 Use of the IDC
QA-2_3 Exceptions to the IDC Technical Information
+
QA-3 Development Works Approval
QA-3_1 General
QA-3_2 Level of Supervision of Construction for De
QA-3_3 Existing Infrastructure
QA-3_4 Compilation of the Development Works Approv
QA-3_5 Pre Application Meeting
QA-3_6 Minimum Information Requirements
QA-3_7 General Report Information
QA-3_8 Type 1 DWA Report
QA-3_9 Type 2 DWA Report Volume 1
QA-3_10 Type 2 DWA Report Volume 2
QA-3_11 Development Drawing Parameters
QA-3_12 Approval
QA-3_13 Liability
QA-3_14 Amendments to Approved Development Works A
QA-3_15 Processing Timeframe
QA-3_16 Delivery Media
QA-3_17 Titling Convention
QA-3_18 Approval of Contractor
QA-3 Appendix A Type 2 Development Work Approval R
DWA-01 Type 1 Works Approval Report Template
DWA-0_2 Type 2 Development Works Approval Report T
AC-2 Type 2 DWA Application Checklist-Development
AC-3 Type 1 ACR Application Checklist Development
AC-3_1 DWA and As-Built Submission Reserves
AC-3_2 DWA and As-Built Submission Transportation/
AC-3_3 DWA and As-Built Submission Stormwater
AC-3_4 DWA and As-Built Submission Wastewater
AC-3_5 DWA and As-Built Submission Water Supply
AC-3_6 DWA and As-Built Submission Natural Hazards
C1 Producer Statement Design
CM-1a Construction Monitoring Services
CM-1b Construction Monitoring Services
CM-1c Construction Monitoring Services
CM-1d Construction Monitoring Services
+
QA-4 Survey Plan (s223) Approval
QA-4_1 General
-
QA-5 Final Sign Off (s224c) Application Requiremen
QA-5_1 General
QA-5_2 Minimum Information Requirements
QA-5_3 Consent Compliance
QA-5_4 Development Completion Report
QA-5_5 As Built Information
QA-5_6 Supporting Documents
QA-5_7 Peer Review
QA-5_8 Delivery Media Digital Media
QA-5_9 Titling Convention
DCR-0_1 Type 1 Development Completion Report Templ
DCR-0_2 Type 2 Development Completion Report Templ
G2 Producer Statement Suitability of Land for Buil
G3 Summary of Geotechnical Data for Individual Lot
G4 Geotechnical Checklist Geotechnical Reporting
AC-2 DWA and As-Built Submission
AC-3 Type 1 ACR Application Checklist
AC-3_1 DWA and As-Built Submission Reserves
AC-3_2 DWA and As-Built Submission Transportation/
AC-3_3 DWA and As-Built Submission Stormwater
AC-3_4 DWA and As-Built Submission Wastewater
AC-3_5 DWA and As-Built Submission Water Supply
AC-3_6 DWA and As-Built Submission Natural Hazards
C2 Streetscape Construction Certification
C3 Reserves Construction Certification
C4 Transportation Construction Certification
C5 Stormwater Construction Certification
C6 Wastewater Construction Certification
C7 Water Supply Construction Certification
C9 Network Utilities Construction Certification
C10 Producer Statement Completed Construction Work
AC-4 Type 2 ACR Application Checklist
AC-5 Application Checklist s224 Application
AR-1 Infrastructure Asset Register
+
QA-6 As-Built Information
QA-6_1 General
QA-6_2 Minimum Requirements
QA-6_3 Provision of As-Builts
QA-6_4 As-Built Information Types
QA-6_5 As-Built Software Requirements
QA-6_6 Timing of As-Built Delivery
QA-6_7 Council's As-Built Process
QA-6_8 As-Built Information Accuracy
QA-6_9 Fees and Charges
QA-6_10 Project Information
QA-6_11 Coordinates and Levels
QA-6_12 Hardcopy (PDF) As-Built Plans
QA-6_13 Benchmarks
QA-6_14 Delivery Media for as-Built Plans and Supp
QA-6_15 Tilting Convention
+
QA-7 Bonds and Maintenance Fee
QA-7_1 General
QA-7_2 Landscaping: Maintenance Works and Incomple
QA-7_3 Other Bonds
QA-7_4 Bonded Works
QA-7_5 Release of Bond
QA-7_6 Non Peformance
QA-7_7 Landscaping: Maintenance Works Handover Fee
QA-7 - Appendix A Landscaping: Maintenance Works B
QA-7 - Appendix B Landscaping: Incomplete Works Bo
QA-7 - Appendix C Landscaping: Maintenance Works H
B1 Bond Form
B2 Bond Form-Schedule of Works
MF1 Maintenance Fee Form
MF2 Maintenance Fee Form-Schedule of Works
QA-8 Building Consent Considerations
+
Design Standards
+
DS-1 General Provisions
DS-1_1 General
DS-1_2 Minimum Requirements
DS-1_3 Alternative Design
DS-1_4 Culture and Heritage
DS-1_5 Health & Safety
DS-1_6 Pollution
DS-1_7 Waste Minimisation
DS-1_8 Ground Conditions
DS-1_9 Sustainable Development
DS-1_10 Development by Urban Design
DS-1_11 Core Design Principles
DS-1_12 Neighbourhood Context and Site Analysis
DS-1_13 Design with the Environment
DS-1_14 Managing Earthworks
DS-1_15 Movement and Access
DS-1_16 Open Spaces
DS-1_17 Streetscape
DS-1_18 Public Transport Network - Bus Routes
DS-1-19 Pedestrians and Cyclists
DS-1_20 Infrastructure Stormwater Management and L
DS-1_21 Putting it all Together
DS-1_22 Easements
DS-1_23 Tauranga Waterfront and CBD Specific Desig
DS-1 Appendix A - Associated Standards
+
DS-2 Streetscape
DS-2_1 General
DS-2_2 Minimum Requirements
DS-2_3 Regional Council Requirements
DS-2_4 Design
DS-2_5 Topsoil and Grassing
DS-2_6 Street Gardens
DS-2_7 Street Trees
DS-2_8 Street Tree Location
DS-2_9 Species Selection
DS-2_10 Quality Control
DS-2_11 Open Space Furniture and Structures
DS-2_12 Irrigation
DS-2_13 Incomplete Works Bond
DS-2-Appendix A-Associated Standards
+
DS-3 Reserves
DS-3_1 General
DS-3_2 Minimum Requirements
DS-3_3 Regional Council Requirements
DS-3_4 Design
DS-3_5 Further Considerations
DS-3-Appendix A - Associated Standards
+
DS-4 Transportation Network
DS-4_1 General
DS-4_2 Minimum Requirements
DS-4_3 Regional Council Requirements
DS-4_4 Design
+
DS-4_5 Conveyance
Table-1-design-requirements-for-various-road-class
DS-4_6 Marking and Signs
DS-4_7 Connection
DS-4_8 Berm Features
DS-4_9 Further Considerations
DS-4 - Appendix A - Associated Standards
DS-4 - Appendix B - Flexible Pavement Design Chart
DS-4 - Appendix C - Street Naming and Sign Standar
DS-4 - Appendix D - Safety Audits
+
DS-5 Stormwater
DS-5_1 General
DS-5_2 Minimum Requirements
DS-5_3 Regional Council Requirements
DS-5_4 Design
DS-5_5 Conveyance Primary and Secondary Systems
DS-5_6 Stormwater Treatment / Detention
DS-5_7 Stormwater Discharge
DS-5_8 Collection
DS-5_9 Further Considerations
DS-5 - Appendix A Associated Standards
DS-5 - Appendix B Design Rainfall Tables
DS-5 - Appendix C Rainfall Intensity Curves
DS-5 - Appendix D Rainfall Depth Information Sheet
DS-5 - Appendix E The Rational Method
DS-5 - Appendix F Disposal Of Stormwater By Ground
DS-5 - Appendix G Soakage Rate Worked Example
+
DS-6 Wastewater
DS-6_1 General
DS-6_2 Minimum Requirements
DS-6_3 Regional Council Requirements
DS-6_4 Design
DS-6_5 Conveyance Wastewater System
DS-6_6 Collection
DS-6_7 Further Considerations
DS-6_8 Wastewater Treatment Design
DS-6_9 Wastewater Pump Stations
DS-6_10 Private Pump Stations
DS-6_11 Receiving Reticulation
DS-6_12 Rising Mains
DS-6_13 Pump Station Layout
DS-6_14 Fittings and Materials
DS-6_15 Pump Station Services
DS-6 Appendix A Associated Standards
+
DS-7 Water Supply
DS-7_1 General
DS-7_2 Minimum Requirements
DS-7_3 Regional Council Requirements
DS-7_4 Non Council Supply
DS-7_5 Design
DS-7_6 Conveyance Reticulation Layout
DS-7_7 Key Operational Fittings
DS-7_8 Point of Supply
DS-7_9 Further Considerations
DS-7 Appendix A Associated Standards
DS-7 Appendix B Conceptual Hydraulic Operation of
+
DS-8 Public Lighting
DS-8_1 General
DS-8_2 Minimum Requirements
DS-8_3 Regional-Council-Requirements
DS-8_4 Design
DS-8_5 Information Requirements
DS-8_6 Public Spaces
DS-8_7 Streetlighting
DS-8_8 Design Criteria
DS-8_9 Approved Materials
DS-8_10 Work Undertaken on Councils Network
DS-8-11 Installation
DS-8 - Appendix A Associated Standards
DS-8 - Appendix B Notable Differences between DS-8
DS-8 - Appendix C Lighting Design Submission Check
DS-8 - Appendix D Lighting Column Submission Check
DS-8 - Appendix E Lighting Column Evaluation Check
DS-8 Proposed examples for new Standard Drawings
+
DS-9 Network Utilities
DS-9_1 General
DS-9_2 Minimum Requirements
DS-9_3 Regional Council Requirements
DS-9_4 Design
DS-9_5 Further Considerations
DS-9-Appendix A - Associated Standards
+
DS-10 Natural Hazards & Earthworks
DS-10_1 General
DS-10_2 Landform Development
DS-10_3 Performance Criteria
DS-10_4 Landform Classification System
DS-10_5 Assessment Process
DS-10_6 Landform Professional Opinion
DS-10_7 Geo-Professional Accreditation System
DS-10_8 Earthworks
DS-10_9 Regional Council Requirements
DS-10_10 Design
DS-10_11 Boulder or Rock-Faced Slopes
DS-10_12 Infill (Secondary) Subdivision
DS-1_13 Companies for Soils and Earthworks Testing
DS-10_14 Data Sharing
DS-10 Appendix A Associated Standards
DS-10 Appendix B Landform Classification System
DS-10 Appendix C Geo Professional Accreditation Sy
DS-10 Appendix D Accredited Geo Professionals
DS-10 Appendix E Assessment and Reporting
DS-10 Appendix F Peer Review Requirements
DS-10 Appendix G Geotechnical Considerations for B
DS-10 Appendix H Geotechnical Requirements Summary
DS-10 Appendix I Liquefaction Hazard Map
+
DS-11 Road Zone/Road Reserve Occupancy
DS-11_1 General
DS-11_2 Minimum Requirements
DS-11_3 Regional Council Requirements
DS-11_4 Corridor Manager
DS-11_5 Utility Operator
DS-11_6 Responsibility for Suppliers, Agents and C
DS-11_7 The Road Zone Occupancy Process
DS-11_8 Location of Utilities
DS-11_9 Design, Construction and Materials
DS-11-Appendix A - Associated Standards
DS-11-Appendix B - General Conditions
DS-11-Appendix C - Utility Operators
DS-11-Appendix D - Guide to Duct Colouring and S
DS-12 Building Consent Considerations (Under Const
+
Standard Drawings
+
SD-1 General Provisions
SD-1_1 General
SD-1_2 Use of the Standard Drawings
SD-1_3 Features of the Standard Drawings
SD-1_4 Perspective Drawings
SD-1_5 Central Business District Drawings
SD-1_6 Quality Assurance Drawings
+
SD-1 Appendix A Schedule of Drawings
SD-1 Appendix A_1 Drawing Schedule
SD-1 Appendix A_2 General Drawings (GEN Series)
SD-1 Appendix A_3 Streetscape (200 Series)
SD-1 Appendix A_4 Reserves (300 Series)
SD-1 Appendix A_5 Transportation Network (400 Seri
SD-1 Appendix A_6 Stormwater (500 Series)
SD-1 Appendix A_7 Wastewater (600 Series)
SD-1 Appendix A_8 Water Supply (700 Series)
SD-1 Appendix A_9 Public Lighting (800 Series)
SD-1 Appendix A_10 Network Utilities (900 Series)
SD-1 Appendix A_11 Natural Hazards and Earthworks
SD-1 Appendix A_12 Wastewater Pump Stations (WBOPD
SD-1 Appendix A_13 Quality Assurance Drawings
+
T100 Perspective Drawings
T101-Perspective Drawing
T102-Perspective Drawing
T103-Perspective Drawing
T104-Perspective Drawing
T105-Perspective Drawing
T106-Perspective Drawing
T107-Perspective Drawing
T108-Perspective Drawing
T109-Perspective Drawing
T110-Perspective Drawing
T111-Perspective Drawing
T112-Perspective Drawing
T113-Perspective Drawing
T114-Perspective Drawing
T115-Perspective Drawing
T116-Perspective Drawing
T117-Perspective Drawing
T118-Perspective Drawing
T119-Perspective Drawing
T120-Perspective Drawing
T121-Perspective Drawing
T122-Perspective Drawing
T123-Perspective Drawing
T124-Perspective Drawing
T125-Perspective Drawing
T126-Perspective Drawing
T130-Perspective Drawing
T131-Perspective Drawing
T132-Perspective Drawing
T133-Perspective Drawing
T134-Perspective Drawing
T135-Perspective Drawing
T140-Perspective Drawing
+
T200 Streetscape
T203-Streetscape
T204-Streetscape
T205-Streetscape
T206-Streetscape
T207-Streetscape
T211-Streetscape
T215-Streetscape
T216-Streetscape
T220-Streetscape
T221-Streetscape
T225-Streetscape
T226-Streetscape
T240 Streetscape
T241 Streetscape
T242 Streetscape
T243 Streetscape
T244 Streetscape
T245 Streetscape
+
T300 Reserves
T303-Reserves
T304-Reserves
T305-Reserves
T311-Reserves
T315-Reserves
T316-Reserves
T317-Reserves
T320-Reserves
T321-Reserves
T322-Reserves
T323-Reserves
T325-Reserves
T326-Reserves
T330-Reserves
T331-Reserves
T335-Reserves
T340-Reserves
T350-Reserves
+
T400 Transport Network
T400-Transport Network
T405-Transport Network
T406-Transport Network
T410-Transport Network
T411-Transport Network
T412-Transport Network
T413-Transport Network
T414-Transport Network
T415-Transport Network
T416-Transport Network
T420-Transport Network
T421-Transport Network
T422-Transport Network
T423-Transport Network
T424-Transport Network
T425-Transport Network
T426-Transport Network
T427-Transport Network
T430-Transport Network
T431-Transport Network
T432-Transport Network
T433-Transport Network
T434-Transport Network
T440-Transport Network
T442-Transport Network
T443-Transport Network
T450-Transport Network
+
T500 Stormwater
T501-Stormwater
T502-Stormwater
T503-Stormwater
T504-Stormwater
T505-Stormwater
T506-Stormwater
T507-Stormwater
T514-Stormwater
T520-Stormwater
T521-Stormwater
T523-Stormwater
T524-Stormwater
T525-Stormwater
T530-Stormwater
T531-Stormwater
T532-Stormwater
T533-Stormwater
T534-Stormwater
T535-Stormwater
T536-Stormwater
T537-Stormwater
T538-Stormwater
T539-Stormwater
T540-Stormwater
T541-Stormwater
T542-Stormwater
T543-Stormwater
T550-Stormwater
T551-Stormwater
T552-Stormwater
T553-Stormwater
T554-Stormwater
+
T600 Wastewater
T601-Wastewater
T602-Wastewater
T603-Wastewater
T604-Wastewater
T605-Wastewater
T606-Wastewater
T607-Wastewater
T608-Wastewater
T609-Wastewater
T610-Wastewater
T611-Wastewater
T612-Wastewater
T613-Wastewater
T614-Wastewater
T620-Wastewater
T621-Wastewater
T630-Wastewater
T631-Wastewater
T632-Wastewater
T633-Wastewater
T634-Wastewater
T637-Wastewater
T638-Wastewater
T639-Wastewater
T640-Wastewater
T641-Wastewater
T642-Wastewater
T643-Wastewater
T651-Wastewater
T652-Wastewater
T653-Wastewater
T654-Wastewater
T660-Wastewater
T661-Wastewater
T662-Wastewater
T663-Wastewater
T664-Wastewater
T665-Wastewater
T666-Wastewater
T667-Wastewater
T668-Wastewater
T669-Wastewater
T670-Wastewater
T671-Wastewater
T672-Wastewater
T673-Wastewater
T674-Wastewater
T675-Wastewater
T676-Wastewater
T677-Wastewater
T678-Wastewater
T679-Wastewater
T680-Wastewater
T681-Wastewater
T682-Wastewater
T683-Wastewater
+
T700 Water Supply
T700-Water Supply
T701-Water Supply
T705-Water Supply
T706-Water Supply
T707-Water Supply
T708-Water Supply
T709-Water Supply
T710-Water Supply
T713-Water Supply
T714-Water Supply
T715-Water Supply
T716-Water Supply
T717-Water Supply
T718-Water Supply
T719-Water Supply
T720-Water Supply
T721-Water Supply
T722-Water Supply
T723-Water Supply
T724-Water Supply
T727-Water Supply
T728-Water Supply
T729-Water Supply
T730-Water Supply
T731-Water Supply
T732-Water Supply
T733-Water Supply
T734-Water Supply
T735-Water Supply
T736-Water Supply
T737-Water Supply
T738-Water Supply
T739-Water Supply
T740-Water Supply
T741-Water Supply
T742-Water Supply
T743-Water Supply
T744-Water Supply
T751-Water Supply
T753-Water Supply
T754-Water Supply
+
T800 Public Lighting
T801-Public-Lighting
+
AB As-Built Drawings
AB-01-As-Built Drawings
AB-02-As-Built Drawings
AB-03-As-Built Drawings
AB-04-As-Built Drawings
AB-100-As-Built Drawings
AB-200-As-Built Drawings
AB-400-As-Built Drawings
AB-500-As-Built Drawings
AB-600-As-Built Drawings
AB-700-As-Built Drawings
AB-800-As-Built Drawings
Approved Materials
+
Construction Standards
+
CS-1 General
CS-1_0 General Provisions
CS-1_1 Minimum Requirements
CS-1_2 Notifiable Works
CS-1_3 Road Zone Occupancy
CS-1_4 Health & Safety
CS-1_5 Confined Spaces
CS-1_6 Public Protection
CS-1_7 Culture and Heritage
CS-1_8 Environmental or Property Damaged
CS-1_9 Pollution
CS-1_10 Existing Utility Services
CS-1_11 Protection of Trees or Other Features
CS-1_12 Dust Control
CS-1_13 Nuisance
CS-1_14 Emergency
CS-1_15 Alternative Construction Methods
CS-1_16 Setting Out
CS-1_17 Inspection and Testing
CS-1_18 As-Built Information
+
CS-2 Site Clearance
CS-2_0 Site Clearance
CS-2_1 Clearing and Removal of Vegetation and Rub
CS-2_2 Burning
+
CS-3 Earthworks
CS-3_0 Earthworks
CS-3_1 Supervision
CS-3_2 Earthworks Management Plan
CS-3_3 Drainage Control
CS_3_4 Erosion & Sediment Control
CS-3_5 Protection & Maintenance of Works
CS-3_6 Modification to Control Systems
CS-3_7 Tolerances
CS-3_8 Inspections and Approvals
CS-3_9 Haul Roads
CS-3_10 Temporary Stockpiles
+
CS-4 Excavation
CS_4_0 Excavation
CS-4_1 Stripping
CS-4_2 Removal of Topsoil
CS-4_3 Excavation Management
CS-4_4 Over Excavation
CS-4_5 Cut to Waste
CS-4_6 Cut to Fill
CS-4_7 Slips
CS-4_8 General Undercutting
CS-4_9 Protection of Subgrade
CS-4_10 Undercut for Shear Keys, Embankments and F
+
CS-5 Excavation in Trench
CS-5_0 Excavation in Trench
CS-5_1 Over Excavation
CS-5_2 Trench Protection
CS-5_3 Groundwater
+
CS-6 Fill
CS-6_0 Fill
CS-6_1 Conditioning and Spreading of Fill
CS-6_2 Placement of Shear Key and Embankment Under
CS-6_3 Compaction
CS-6_4 Compaction Trials
CS-6_5 Compaction Standards and Testing
CS-6_6 Shaping
CS-6_7 Topsoil Respreading
+
CS-7 Bedding & Backfill
CS-7_0 Bedding and Backfill
CS-7_1 Backfill Material
CS-7_2 Compaction
+
CS-8 Subsoil Drainage for Earthworks & Roads
CS-8_0 Subsoil Drainage for Earthworks and Roads
+
CS-9 Pipework
CS-9_0 Pipework
CS-9_1 Jointing
CS-9_2 Laterals and End Caps
CS-9_3 Service Connections
CS-9_4 Tolerances
CS-9_5 Identification and Marking of Pipelines
CS-9_6 Cleaning and Disinfection of Watermains
CS-9_7 Connection to an Existing Network
+
CS-10 Pipe Fittings
CS-10_0 Pipe Fittings
CS-10_1 Fire Hydrants
CS-10_2 Valves
CS-10_3 Anchor and Thrust Blocks
+
CS-11 Manholes & Rodding Eyes
CS-11_0 Manholes and Rodding Eyes
CS-11_1 Invert Levels
CS-11_2 Channels and Benching
CS-11_3 Flexible Joints
CS-11_4 Sealing of Manholes
CS-11_5 Completion of Manholes
CS-11_6 Drop Connection
CS-11_7 Access Steps
CS-11_8 Rodding Eyes
+
CS-12 Sumps
CS-12_0 Sumps
+
CS-13 Trenchless Technology
CS-13_0 Trenchless Technology
CS-13_1 Location of Existing Services
CS-13_2 Alignment
CS-13_3 Directional Drilling
CS-13_4 Pipe Thrusting
CS-13_5 Guided Boring/Auger Boring
CS-13_6 Pipe Bursting
CS-13_7 Pipe Splitting
CS-13_8 Tolerances
CS-13_9 Damage
+
CS-14 Road Ripping
CS-14_0 Road Ripping
CS-14_1 Ripping To Allow Placement of Additional B
CS-14_2 Use of Ripped Material
CS-14_3 Placing, Shaping and Compacting of Reused
CS-14_4 Asphalt Patch Surface
+
CS-15 Road Pavement Layers
CS-15_0 Road Pavement Layers
CS-15_1 Subgrade Layer
CS-15_2 Sub-Base Layer
CS-15_3 Basecourse Layer
CS-15_4 Cement Stabiliation of Pavement Layers
+
CS-16 Kerb & Channel
CS-16_0 Kerb and Channel
CS-16_1 Kerb and Channel Removal
CS-16_2 Saw Cutting
CS-16_3 Excavation to Pavement Depth
CS-16_4 Subgrade Preparation
CS-16_5 Kerb and Channel Foundation
CS-16_6 Kerb and Channel Placing
CS-16_7 Carriageway Reinstatement
+
CS-17 Concrete Work
CS-17_0 Concrete Work
CS-17_1 Formwork
CS-17_2 Concrete Mix and Proportions
CS-17_3 Placing Concrete
CS-17_4 Reinforcement
CS-17_5 Curing Of Concrete
CS-17_6 Machine Laid Kerb and Channel
CS-17_7 Finished Work
CS-17_8 Contraction/Expansion Joints
CS-17_9 Backfilling Against Concrete Work
CS-17_10 Surface Finish (Footpath and Vehicle Cros
+
CS-18 Carriageway Surfacing
CS-18_0 Carriageway Surfacing
CS-18_1 Two Coat Seal (First Coat with Wet locking
CS-18_2 Two Coat Seal and Open Graded Porous Aspha
CS-18_3 Single Coat Membrane Seal and Asphaltic Co
CS-18_4 Requirements after Chip Sealing
CS-18_5 Removal of Surplus Chip
CS-18_6 Protection and Repairs of the Seal Coat
+
CS-19 Roadmarking
CS-19_0 Roadmarking
+
CS-20 Berm Features
CS-20_0 Berm Features
CS-20_1 Alignments, Line and Levels
CS-20_2 Break-out, Removal and Disposal of Existin
CS-20_3 Excavation to Footpath Depth
CS-20_4 Subgrade Preperation
CS-20_5 Pavement-Course for Berm Features
CS-20_6 Concrete Footpaths and Vehicle Crossings
CS-20_7 Contraction/Expansion Joints
CS-20_8 Asphalt Surfacing
CS-20_9 Asphalt Overlay
CS-20_10 Block Paving
CS-20_11 Edge Restraints
CS-20_12 Timber Edging for Seal, Asphalt, Paving,
+
CS-21 Street Structures
CS-21_0 Street Structures
CS-21_1 Road Signs
CS-21_2 Safety Barriers
CS-21_3 Bollards and Removable Bollards
CS-21_4 Pedestrian Barrier Rails and Handrails
CS-21_5 Cycle Barriers and Racks
CS-21_6 Public Lighting
+
CS-22 Road Maintenance
CS-22_0 Road Maintenance
CS-22_1 Pot Holes
CS-22_2 Dig Outs
CS-22_3 Crack Sealing
CS-22_4 Surface Defects
CS-22_5 Edge Breaks
CS-22_6 Unsealed Shoulders
CS-22_7 Surface Detritus
CS-22_8 Edge Marker Posts
CS-22_9 Guardrails and Median Barriers
CS-22_10 Traffic Signs, Chevrons, Markers and Sigh
CS-22_11 Vegetation
+
CS-23 Grassing & Turfing
CS-23_0 Grassing and Turfing
CS-23_1 Preparation for Sowing or Turfing
CS-23_2 Topsoil Spreading/Re-spreading
CS-23_3 Fertiliser
CS-23_4 Sowing2
CS-23_5 Establishment of Sown Areas
CS-23_6 Weeds
CS-23_7 Defects Liability Period
+
CS-24 Vegetation Planting & Gardens
CS-24_0 Vegetation Planting and Gardens
CS-24_1 Soil and Fertility
CS-24_2 Mulch
CS-24_3 Juvenile Tree Planting
CS-24_4 Pruning
+
CS-25 Reinstatement
CS-25_0 Reinstatement
CS-25_1 Removed Items
+
Inspection & Testing Requirements
+
IT-1 General Provision
IT-1_1 General
IT-1_2 Minimum Requirements
IT-1_3 Applying for Inspections
IT-1_4 Asset Inspection/Testing Requirements
IT-1_5 Random Inspections
IT-1_6 Final Inspection
IT-1_7 Liability
+
IT-1 Appendix A - Inspection and Testing Summary
IT-1 Appendix A-1 Inspection and Testing Summary
+
IT-1 Appendix B-Company Requirements for Soils, Ea
IT-1 Appendix B_1 Minimum Requirements
+
IT-1 Appendix C - Closed Circuit Television Inspec
IT-1 Appendix C_1 General
IT-1 Appendix C_2 Engaging a CCTV Provider
IT-1 Appendix C_3 Responsibilities of all Parties
IT-1 Appendix C_4 Cleaning
IT-1 Appendix C_5 Water Flow in Pipe
IT-1 Appendix C_6 Defect Codes
IT-1 Appendix C_7 Failure Triggers
IT-1 Appendix C_8 Failures
IT-1 Appendix C_9 Major Defects Requiring Immediat
IT-1 Appendix C_10 Deliverables
+
IT-2 Streetscape
IT-2_1 Inspection
IT-2_2 Testing
+
IT-3 Reserves
IT-3_1 Inspection
IT-3_2 Testing
+
IT-4 Transportation Network
IT-4_1 Inspection
IT-4_2 Testing
+
IT_4 Appendix-Company Requirements for Pavement Te
IT-4-Appendix A_1 General
IS4_1 Inspection Sheet Vehicle Crossing
IS4_2 Inspection Sheet Pre-Seal
+
IT-5 Stormwater
IT-5_1 Inspection
IT-5_2 Testing
IS5_1 Inspection Sheet Stormwater Manhole and Pipe
1S5_2 Inspection Sheet Sump
+
IT-6 Wastewater
IT-6_1 Inspection
IT-6_2 Testing
IS6_1 Wastewater Manhole and Pipeline
TS6_1 Wastewater Low Pressure Air Test
TS6_2 Wastewater High Pressure Air Test
TS6_3 Wastewater Rising Main Pressure Test
TS6_4 Manhole Infiltration Test
+
IT-7 Water Supply
IT-7_1 Inspection
IT-7_2 Testing
IS7_1 Inspection Sheet-Hydrant
IS7_2 Inspection Sheet - Valve
IS7_3 Inspection Sheet - Water Connection
TS7_2 Disinfection Mixture
+
IT-8 Public Lighting
IT-8_1 Inspection
IT-8_2 Testing
+
IT-9 Network Utilities
IT-9_1 Inspection
IT-9_2 Testing
GO
Home
+
General
+
GEN-1 Introduction
GEN-1_1 Philosophy
GEN-1_2 Scope/Applicability
GEN-1_3 IDC Layout
GEN-1_4 IDC Availability
GEN-1_5 Statutory Requirements
GEN-1_6 Relationship Between the IDC and Resource
GEN-1_7 Relationship Between the IDC and Building
GEN-1_8 Implementation of the IDC
GEN-1_9 Standards
GEN-1_10 Other Authorities
+
GEN-2 Strategic Alignment
GEN-2_1 General
GEN-2_2 Smartgrowth Strategy and Implementation Pl
GEN-2_3 Smartgrowth's Impact on the IDC
+
GEN-3 Level of Service
GEN-3-1 General
GEN-3-2 Context-Local Government Act 2002
GEN-3-3 How Councils Set Levels of Service
GEN-3-4 Maximums & Minimums
GEN-3-5 Geographical Differences in Levels of Se
GEN-3_6 Zoning and Land Use Differences in Levels
GEN-3-7 WBOPDC Level of Service
GEN-3-8 How to Change Levels of Service
GEN-3_9 Levels of Service and the IDC
+
GEN-4 Definitions
GEN-4_1 General
GEN-4_2 Abbreviations
GEN-4_3 Definitions
+
GEN-5 Document Control & Management
GEN-5_1 General
GEN-5_2 Amendment Processes
GEN-5_3 Advisory Panel
GEN-5_4 Adoption and Delegations
GEN-5_5 Notification
GEN-5_6 Table of Amendments
GEN-5_7 Publication
+
Infrastructure Development Processes
+
ID-1 Infrastructure Development Processes
ID-1_1 General
ID-1_2 Development Works associated with a Resourc
ID-1_3 Other Works not associated with a Resource
ID-1 - Appendix A Process Maps
PD-1 Lifecycle of an Asset Process Map
PD-2 Resource Consent Application Process Map
PD-3 Development Works Approval Process
PD-4 Amendment to DWA Approval
PD-5 Amendment to Approved Development Works Appli
PD-6 s223 Application Process Map
PD-7 s224(c) Application Process Map
PD-8 Approved Materials Process Map
-
Quality Assurance Information Requirements
+
QA_1 Resource Consent Application Requirements
QA-1_1 General
QA-1_2 Development Works
QA-1_3 Development Evaluation Report
QA-1_4 Minimum Information Requirements
QA-1_5 Compilation of the Report
QA-1_6 Drawing Information
QA-1_7 Supporting Documents
QA-1_8 Delivery Media - Digital Data
QA-1_9 Titling Convention
QA-1_10 Peer Review
QA-1 Appendix A Peer Review Requirements
AC_1 Application Checklist Development Evaluation
G1 Producer Statement Suitability of Land for Subd
+
QA-2 Works Undertaken By or For a Council
QA-2_1 General
QA-2_2 Use of the IDC
QA-2_3 Exceptions to the IDC Technical Information
+
QA-3 Development Works Approval
QA-3_1 General
QA-3_2 Level of Supervision of Construction for De
QA-3_3 Existing Infrastructure
QA-3_4 Compilation of the Development Works Approv
QA-3_5 Pre Application Meeting
QA-3_6 Minimum Information Requirements
QA-3_7 General Report Information
QA-3_8 Type 1 DWA Report
QA-3_9 Type 2 DWA Report Volume 1
QA-3_10 Type 2 DWA Report Volume 2
QA-3_11 Development Drawing Parameters
QA-3_12 Approval
QA-3_13 Liability
QA-3_14 Amendments to Approved Development Works A
QA-3_15 Processing Timeframe
QA-3_16 Delivery Media
QA-3_17 Titling Convention
QA-3_18 Approval of Contractor
QA-3 Appendix A Type 2 Development Work Approval R
DWA-01 Type 1 Works Approval Report Template
DWA-0_2 Type 2 Development Works Approval Report T
AC-2 Type 2 DWA Application Checklist-Development
AC-3 Type 1 ACR Application Checklist Development
AC-3_1 DWA and As-Built Submission Reserves
AC-3_2 DWA and As-Built Submission Transportation/
AC-3_3 DWA and As-Built Submission Stormwater
AC-3_4 DWA and As-Built Submission Wastewater
AC-3_5 DWA and As-Built Submission Water Supply
AC-3_6 DWA and As-Built Submission Natural Hazards
C1 Producer Statement Design
CM-1a Construction Monitoring Services
CM-1b Construction Monitoring Services
CM-1c Construction Monitoring Services
CM-1d Construction Monitoring Services
+
QA-4 Survey Plan (s223) Approval
QA-4_1 General
-
QA-5 Final Sign Off (s224c) Application Requiremen
QA-5_1 General
QA-5_2 Minimum Information Requirements
QA-5_3 Consent Compliance
QA-5_4 Development Completion Report
QA-5_5 As Built Information
QA-5_6 Supporting Documents
QA-5_7 Peer Review
QA-5_8 Delivery Media Digital Media
QA-5_9 Titling Convention
DCR-0_1 Type 1 Development Completion Report Templ
DCR-0_2 Type 2 Development Completion Report Templ
G2 Producer Statement Suitability of Land for Buil
G3 Summary of Geotechnical Data for Individual Lot
G4 Geotechnical Checklist Geotechnical Reporting
AC-2 DWA and As-Built Submission
AC-3 Type 1 ACR Application Checklist
AC-3_1 DWA and As-Built Submission Reserves
AC-3_2 DWA and As-Built Submission Transportation/
AC-3_3 DWA and As-Built Submission Stormwater
AC-3_4 DWA and As-Built Submission Wastewater
AC-3_5 DWA and As-Built Submission Water Supply
AC-3_6 DWA and As-Built Submission Natural Hazards
C2 Streetscape Construction Certification
C3 Reserves Construction Certification
C4 Transportation Construction Certification
C5 Stormwater Construction Certification
C6 Wastewater Construction Certification
C7 Water Supply Construction Certification
C9 Network Utilities Construction Certification
C10 Producer Statement Completed Construction Work
AC-4 Type 2 ACR Application Checklist
AC-5 Application Checklist s224 Application
AR-1 Infrastructure Asset Register
+
QA-6 As-Built Information
QA-6_1 General
QA-6_2 Minimum Requirements
QA-6_3 Provision of As-Builts
QA-6_4 As-Built Information Types
QA-6_5 As-Built Software Requirements
QA-6_6 Timing of As-Built Delivery
QA-6_7 Council's As-Built Process
QA-6_8 As-Built Information Accuracy
QA-6_9 Fees and Charges
QA-6_10 Project Information
QA-6_11 Coordinates and Levels
QA-6_12 Hardcopy (PDF) As-Built Plans
QA-6_13 Benchmarks
QA-6_14 Delivery Media for as-Built Plans and Supp
QA-6_15 Tilting Convention
+
QA-7 Bonds and Maintenance Fee
QA-7_1 General
QA-7_2 Landscaping: Maintenance Works and Incomple
QA-7_3 Other Bonds
QA-7_4 Bonded Works
QA-7_5 Release of Bond
QA-7_6 Non Peformance
QA-7_7 Landscaping: Maintenance Works Handover Fee
QA-7 - Appendix A Landscaping: Maintenance Works B
QA-7 - Appendix B Landscaping: Incomplete Works Bo
QA-7 - Appendix C Landscaping: Maintenance Works H
B1 Bond Form
B2 Bond Form-Schedule of Works
MF1 Maintenance Fee Form
MF2 Maintenance Fee Form-Schedule of Works
QA-8 Building Consent Considerations
+
Design Standards
+
DS-1 General Provisions
DS-1_1 General
DS-1_2 Minimum Requirements
DS-1_3 Alternative Design
DS-1_4 Culture and Heritage
DS-1_5 Health & Safety
DS-1_6 Pollution
DS-1_7 Waste Minimisation
DS-1_8 Ground Conditions
DS-1_9 Sustainable Development
DS-1_10 Development by Urban Design
DS-1_11 Core Design Principles
DS-1_12 Neighbourhood Context and Site Analysis
DS-1_13 Design with the Environment
DS-1_14 Managing Earthworks
DS-1_15 Movement and Access
DS-1_16 Open Spaces
DS-1_17 Streetscape
DS-1_18 Public Transport Network - Bus Routes
DS-1-19 Pedestrians and Cyclists
DS-1_20 Infrastructure Stormwater Management and L
DS-1_21 Putting it all Together
DS-1_22 Easements
DS-1_23 Tauranga Waterfront and CBD Specific Desig
DS-1 Appendix A - Associated Standards
+
DS-2 Streetscape
DS-2_1 General
DS-2_2 Minimum Requirements
DS-2_3 Regional Council Requirements
DS-2_4 Design
DS-2_5 Topsoil and Grassing
DS-2_6 Street Gardens
DS-2_7 Street Trees
DS-2_8 Street Tree Location
DS-2_9 Species Selection
DS-2_10 Quality Control
DS-2_11 Open Space Furniture and Structures
DS-2_12 Irrigation
DS-2_13 Incomplete Works Bond
DS-2-Appendix A-Associated Standards
+
DS-3 Reserves
DS-3_1 General
DS-3_2 Minimum Requirements
DS-3_3 Regional Council Requirements
DS-3_4 Design
DS-3_5 Further Considerations
DS-3-Appendix A - Associated Standards
+
DS-4 Transportation Network
DS-4_1 General
DS-4_2 Minimum Requirements
DS-4_3 Regional Council Requirements
DS-4_4 Design
+
DS-4_5 Conveyance
Table-1-design-requirements-for-various-road-class
DS-4_6 Marking and Signs
DS-4_7 Connection
DS-4_8 Berm Features
DS-4_9 Further Considerations
DS-4 - Appendix A - Associated Standards
DS-4 - Appendix B - Flexible Pavement Design Chart
DS-4 - Appendix C - Street Naming and Sign Standar
DS-4 - Appendix D - Safety Audits
+
DS-5 Stormwater
DS-5_1 General
DS-5_2 Minimum Requirements
DS-5_3 Regional Council Requirements
DS-5_4 Design
DS-5_5 Conveyance Primary and Secondary Systems
DS-5_6 Stormwater Treatment / Detention
DS-5_7 Stormwater Discharge
DS-5_8 Collection
DS-5_9 Further Considerations
DS-5 - Appendix A Associated Standards
DS-5 - Appendix B Design Rainfall Tables
DS-5 - Appendix C Rainfall Intensity Curves
DS-5 - Appendix D Rainfall Depth Information Sheet
DS-5 - Appendix E The Rational Method
DS-5 - Appendix F Disposal Of Stormwater By Ground
DS-5 - Appendix G Soakage Rate Worked Example
+
DS-6 Wastewater
DS-6_1 General
DS-6_2 Minimum Requirements
DS-6_3 Regional Council Requirements
DS-6_4 Design
DS-6_5 Conveyance Wastewater System
DS-6_6 Collection
DS-6_7 Further Considerations
DS-6_8 Wastewater Treatment Design
DS-6_9 Wastewater Pump Stations
DS-6_10 Private Pump Stations
DS-6_11 Receiving Reticulation
DS-6_12 Rising Mains
DS-6_13 Pump Station Layout
DS-6_14 Fittings and Materials
DS-6_15 Pump Station Services
DS-6 Appendix A Associated Standards
+
DS-7 Water Supply
DS-7_1 General
DS-7_2 Minimum Requirements
DS-7_3 Regional Council Requirements
DS-7_4 Non Council Supply
DS-7_5 Design
DS-7_6 Conveyance Reticulation Layout
DS-7_7 Key Operational Fittings
DS-7_8 Point of Supply
DS-7_9 Further Considerations
DS-7 Appendix A Associated Standards
DS-7 Appendix B Conceptual Hydraulic Operation of
+
DS-8 Public Lighting
DS-8_1 General
DS-8_2 Minimum Requirements
DS-8_3 Regional-Council-Requirements
DS-8_4 Design
DS-8_5 Information Requirements
DS-8_6 Public Spaces
DS-8_7 Streetlighting
DS-8_8 Design Criteria
DS-8_9 Approved Materials
DS-8_10 Work Undertaken on Councils Network
DS-8-11 Installation
DS-8 - Appendix A Associated Standards
DS-8 - Appendix B Notable Differences between DS-8
DS-8 - Appendix C Lighting Design Submission Check
DS-8 - Appendix D Lighting Column Submission Check
DS-8 - Appendix E Lighting Column Evaluation Check
DS-8 Proposed examples for new Standard Drawings
+
DS-9 Network Utilities
DS-9_1 General
DS-9_2 Minimum Requirements
DS-9_3 Regional Council Requirements
DS-9_4 Design
DS-9_5 Further Considerations
DS-9-Appendix A - Associated Standards
+
DS-10 Natural Hazards & Earthworks
DS-10_1 General
DS-10_2 Landform Development
DS-10_3 Performance Criteria
DS-10_4 Landform Classification System
DS-10_5 Assessment Process
DS-10_6 Landform Professional Opinion
DS-10_7 Geo-Professional Accreditation System
DS-10_8 Earthworks
DS-10_9 Regional Council Requirements
DS-10_10 Design
DS-10_11 Boulder or Rock-Faced Slopes
DS-10_12 Infill (Secondary) Subdivision
DS-1_13 Companies for Soils and Earthworks Testing
DS-10_14 Data Sharing
DS-10 Appendix A Associated Standards
DS-10 Appendix B Landform Classification System
DS-10 Appendix C Geo Professional Accreditation Sy
DS-10 Appendix D Accredited Geo Professionals
DS-10 Appendix E Assessment and Reporting
DS-10 Appendix F Peer Review Requirements
DS-10 Appendix G Geotechnical Considerations for B
DS-10 Appendix H Geotechnical Requirements Summary
DS-10 Appendix I Liquefaction Hazard Map
+
DS-11 Road Zone/Road Reserve Occupancy
DS-11_1 General
DS-11_2 Minimum Requirements
DS-11_3 Regional Council Requirements
DS-11_4 Corridor Manager
DS-11_5 Utility Operator
DS-11_6 Responsibility for Suppliers, Agents and C
DS-11_7 The Road Zone Occupancy Process
DS-11_8 Location of Utilities
DS-11_9 Design, Construction and Materials
DS-11-Appendix A - Associated Standards
DS-11-Appendix B - General Conditions
DS-11-Appendix C - Utility Operators
DS-11-Appendix D - Guide to Duct Colouring and S
DS-12 Building Consent Considerations (Under Const
+
Standard Drawings
+
SD-1 General Provisions
SD-1_1 General
SD-1_2 Use of the Standard Drawings
SD-1_3 Features of the Standard Drawings
SD-1_4 Perspective Drawings
SD-1_5 Central Business District Drawings
SD-1_6 Quality Assurance Drawings
+
SD-1 Appendix A Schedule of Drawings
SD-1 Appendix A_1 Drawing Schedule
SD-1 Appendix A_2 General Drawings (GEN Series)
SD-1 Appendix A_3 Streetscape (200 Series)
SD-1 Appendix A_4 Reserves (300 Series)
SD-1 Appendix A_5 Transportation Network (400 Seri
SD-1 Appendix A_6 Stormwater (500 Series)
SD-1 Appendix A_7 Wastewater (600 Series)
SD-1 Appendix A_8 Water Supply (700 Series)
SD-1 Appendix A_9 Public Lighting (800 Series)
SD-1 Appendix A_10 Network Utilities (900 Series)
SD-1 Appendix A_11 Natural Hazards and Earthworks
SD-1 Appendix A_12 Wastewater Pump Stations (WBOPD
SD-1 Appendix A_13 Quality Assurance Drawings
+
T100 Perspective Drawings
T101-Perspective Drawing
T102-Perspective Drawing
T103-Perspective Drawing
T104-Perspective Drawing
T105-Perspective Drawing
T106-Perspective Drawing
T107-Perspective Drawing
T108-Perspective Drawing
T109-Perspective Drawing
T110-Perspective Drawing
T111-Perspective Drawing
T112-Perspective Drawing
T113-Perspective Drawing
T114-Perspective Drawing
T115-Perspective Drawing
T116-Perspective Drawing
T117-Perspective Drawing
T118-Perspective Drawing
T119-Perspective Drawing
T120-Perspective Drawing
T121-Perspective Drawing
T122-Perspective Drawing
T123-Perspective Drawing
T124-Perspective Drawing
T125-Perspective Drawing
T126-Perspective Drawing
T130-Perspective Drawing
T131-Perspective Drawing
T132-Perspective Drawing
T133-Perspective Drawing
T134-Perspective Drawing
T135-Perspective Drawing
T140-Perspective Drawing
+
T200 Streetscape
T203-Streetscape
T204-Streetscape
T205-Streetscape
T206-Streetscape
T207-Streetscape
T211-Streetscape
T215-Streetscape
T216-Streetscape
T220-Streetscape
T221-Streetscape
T225-Streetscape
T226-Streetscape
T240 Streetscape
T241 Streetscape
T242 Streetscape
T243 Streetscape
T244 Streetscape
T245 Streetscape
+
T300 Reserves
T303-Reserves
T304-Reserves
T305-Reserves
T311-Reserves
T315-Reserves
T316-Reserves
T317-Reserves
T320-Reserves
T321-Reserves
T322-Reserves
T323-Reserves
T325-Reserves
T326-Reserves
T330-Reserves
T331-Reserves
T335-Reserves
T340-Reserves
T350-Reserves
+
T400 Transport Network
T400-Transport Network
T405-Transport Network
T406-Transport Network
T410-Transport Network
T411-Transport Network
T412-Transport Network
T413-Transport Network
T414-Transport Network
T415-Transport Network
T416-Transport Network
T420-Transport Network
T421-Transport Network
T422-Transport Network
T423-Transport Network
T424-Transport Network
T425-Transport Network
T426-Transport Network
T427-Transport Network
T430-Transport Network
T431-Transport Network
T432-Transport Network
T433-Transport Network
T434-Transport Network
T440-Transport Network
T442-Transport Network
T443-Transport Network
T450-Transport Network
+
T500 Stormwater
T501-Stormwater
T502-Stormwater
T503-Stormwater
T504-Stormwater
T505-Stormwater
T506-Stormwater
T507-Stormwater
T514-Stormwater
T520-Stormwater
T521-Stormwater
T523-Stormwater
T524-Stormwater
T525-Stormwater
T530-Stormwater
T531-Stormwater
T532-Stormwater
T533-Stormwater
T534-Stormwater
T535-Stormwater
T536-Stormwater
T537-Stormwater
T538-Stormwater
T539-Stormwater
T540-Stormwater
T541-Stormwater
T542-Stormwater
T543-Stormwater
T550-Stormwater
T551-Stormwater
T552-Stormwater
T553-Stormwater
T554-Stormwater
+
T600 Wastewater
T601-Wastewater
T602-Wastewater
T603-Wastewater
T604-Wastewater
T605-Wastewater
T606-Wastewater
T607-Wastewater
T608-Wastewater
T609-Wastewater
T610-Wastewater
T611-Wastewater
T612-Wastewater
T613-Wastewater
T614-Wastewater
T620-Wastewater
T621-Wastewater
T630-Wastewater
T631-Wastewater
T632-Wastewater
T633-Wastewater
T634-Wastewater
T637-Wastewater
T638-Wastewater
T639-Wastewater
T640-Wastewater
T641-Wastewater
T642-Wastewater
T643-Wastewater
T651-Wastewater
T652-Wastewater
T653-Wastewater
T654-Wastewater
T660-Wastewater
T661-Wastewater
T662-Wastewater
T663-Wastewater
T664-Wastewater
T665-Wastewater
T666-Wastewater
T667-Wastewater
T668-Wastewater
T669-Wastewater
T670-Wastewater
T671-Wastewater
T672-Wastewater
T673-Wastewater
T674-Wastewater
T675-Wastewater
T676-Wastewater
T677-Wastewater
T678-Wastewater
T679-Wastewater
T680-Wastewater
T681-Wastewater
T682-Wastewater
T683-Wastewater
+
T700 Water Supply
T700-Water Supply
T701-Water Supply
T705-Water Supply
T706-Water Supply
T707-Water Supply
T708-Water Supply
T709-Water Supply
T710-Water Supply
T713-Water Supply
T714-Water Supply
T715-Water Supply
T716-Water Supply
T717-Water Supply
T718-Water Supply
T719-Water Supply
T720-Water Supply
T721-Water Supply
T722-Water Supply
T723-Water Supply
T724-Water Supply
T727-Water Supply
T728-Water Supply
T729-Water Supply
T730-Water Supply
T731-Water Supply
T732-Water Supply
T733-Water Supply
T734-Water Supply
T735-Water Supply
T736-Water Supply
T737-Water Supply
T738-Water Supply
T739-Water Supply
T740-Water Supply
T741-Water Supply
T742-Water Supply
T743-Water Supply
T744-Water Supply
T751-Water Supply
T753-Water Supply
T754-Water Supply
+
T800 Public Lighting
T801-Public-Lighting
+
AB As-Built Drawings
AB-01-As-Built Drawings
AB-02-As-Built Drawings
AB-03-As-Built Drawings
AB-04-As-Built Drawings
AB-100-As-Built Drawings
AB-200-As-Built Drawings
AB-400-As-Built Drawings
AB-500-As-Built Drawings
AB-600-As-Built Drawings
AB-700-As-Built Drawings
AB-800-As-Built Drawings
Approved Materials
+
Construction Standards
+
CS-1 General
CS-1_0 General Provisions
CS-1_1 Minimum Requirements
CS-1_2 Notifiable Works
CS-1_3 Road Zone Occupancy
CS-1_4 Health & Safety
CS-1_5 Confined Spaces
CS-1_6 Public Protection
CS-1_7 Culture and Heritage
CS-1_8 Environmental or Property Damaged
CS-1_9 Pollution
CS-1_10 Existing Utility Services
CS-1_11 Protection of Trees or Other Features
CS-1_12 Dust Control
CS-1_13 Nuisance
CS-1_14 Emergency
CS-1_15 Alternative Construction Methods
CS-1_16 Setting Out
CS-1_17 Inspection and Testing
CS-1_18 As-Built Information
+
CS-2 Site Clearance
CS-2_0 Site Clearance
CS-2_1 Clearing and Removal of Vegetation and Rub
CS-2_2 Burning
+
CS-3 Earthworks
CS-3_0 Earthworks
CS-3_1 Supervision
CS-3_2 Earthworks Management Plan
CS-3_3 Drainage Control
CS_3_4 Erosion & Sediment Control
CS-3_5 Protection & Maintenance of Works
CS-3_6 Modification to Control Systems
CS-3_7 Tolerances
CS-3_8 Inspections and Approvals
CS-3_9 Haul Roads
CS-3_10 Temporary Stockpiles
+
CS-4 Excavation
CS_4_0 Excavation
CS-4_1 Stripping
CS-4_2 Removal of Topsoil
CS-4_3 Excavation Management
CS-4_4 Over Excavation
CS-4_5 Cut to Waste
CS-4_6 Cut to Fill
CS-4_7 Slips
CS-4_8 General Undercutting
CS-4_9 Protection of Subgrade
CS-4_10 Undercut for Shear Keys, Embankments and F
+
CS-5 Excavation in Trench
CS-5_0 Excavation in Trench
CS-5_1 Over Excavation
CS-5_2 Trench Protection
CS-5_3 Groundwater
+
CS-6 Fill
CS-6_0 Fill
CS-6_1 Conditioning and Spreading of Fill
CS-6_2 Placement of Shear Key and Embankment Under
CS-6_3 Compaction
CS-6_4 Compaction Trials
CS-6_5 Compaction Standards and Testing
CS-6_6 Shaping
CS-6_7 Topsoil Respreading
+
CS-7 Bedding & Backfill
CS-7_0 Bedding and Backfill
CS-7_1 Backfill Material
CS-7_2 Compaction
+
CS-8 Subsoil Drainage for Earthworks & Roads
CS-8_0 Subsoil Drainage for Earthworks and Roads
+
CS-9 Pipework
CS-9_0 Pipework
CS-9_1 Jointing
CS-9_2 Laterals and End Caps
CS-9_3 Service Connections
CS-9_4 Tolerances
CS-9_5 Identification and Marking of Pipelines
CS-9_6 Cleaning and Disinfection of Watermains
CS-9_7 Connection to an Existing Network
+
CS-10 Pipe Fittings
CS-10_0 Pipe Fittings
CS-10_1 Fire Hydrants
CS-10_2 Valves
CS-10_3 Anchor and Thrust Blocks
+
CS-11 Manholes & Rodding Eyes
CS-11_0 Manholes and Rodding Eyes
CS-11_1 Invert Levels
CS-11_2 Channels and Benching
CS-11_3 Flexible Joints
CS-11_4 Sealing of Manholes
CS-11_5 Completion of Manholes
CS-11_6 Drop Connection
CS-11_7 Access Steps
CS-11_8 Rodding Eyes
+
CS-12 Sumps
CS-12_0 Sumps
+
CS-13 Trenchless Technology
CS-13_0 Trenchless Technology
CS-13_1 Location of Existing Services
CS-13_2 Alignment
CS-13_3 Directional Drilling
CS-13_4 Pipe Thrusting
CS-13_5 Guided Boring/Auger Boring
CS-13_6 Pipe Bursting
CS-13_7 Pipe Splitting
CS-13_8 Tolerances
CS-13_9 Damage
+
CS-14 Road Ripping
CS-14_0 Road Ripping
CS-14_1 Ripping To Allow Placement of Additional B
CS-14_2 Use of Ripped Material
CS-14_3 Placing, Shaping and Compacting of Reused
CS-14_4 Asphalt Patch Surface
+
CS-15 Road Pavement Layers
CS-15_0 Road Pavement Layers
CS-15_1 Subgrade Layer
CS-15_2 Sub-Base Layer
CS-15_3 Basecourse Layer
CS-15_4 Cement Stabiliation of Pavement Layers
+
CS-16 Kerb & Channel
CS-16_0 Kerb and Channel
CS-16_1 Kerb and Channel Removal
CS-16_2 Saw Cutting
CS-16_3 Excavation to Pavement Depth
CS-16_4 Subgrade Preparation
CS-16_5 Kerb and Channel Foundation
CS-16_6 Kerb and Channel Placing
CS-16_7 Carriageway Reinstatement
+
CS-17 Concrete Work
CS-17_0 Concrete Work
CS-17_1 Formwork
CS-17_2 Concrete Mix and Proportions
CS-17_3 Placing Concrete
CS-17_4 Reinforcement
CS-17_5 Curing Of Concrete
CS-17_6 Machine Laid Kerb and Channel
CS-17_7 Finished Work
CS-17_8 Contraction/Expansion Joints
CS-17_9 Backfilling Against Concrete Work
CS-17_10 Surface Finish (Footpath and Vehicle Cros
+
CS-18 Carriageway Surfacing
CS-18_0 Carriageway Surfacing
CS-18_1 Two Coat Seal (First Coat with Wet locking
CS-18_2 Two Coat Seal and Open Graded Porous Aspha
CS-18_3 Single Coat Membrane Seal and Asphaltic Co
CS-18_4 Requirements after Chip Sealing
CS-18_5 Removal of Surplus Chip
CS-18_6 Protection and Repairs of the Seal Coat
+
CS-19 Roadmarking
CS-19_0 Roadmarking
+
CS-20 Berm Features
CS-20_0 Berm Features
CS-20_1 Alignments, Line and Levels
CS-20_2 Break-out, Removal and Disposal of Existin
CS-20_3 Excavation to Footpath Depth
CS-20_4 Subgrade Preperation
CS-20_5 Pavement-Course for Berm Features
CS-20_6 Concrete Footpaths and Vehicle Crossings
CS-20_7 Contraction/Expansion Joints
CS-20_8 Asphalt Surfacing
CS-20_9 Asphalt Overlay
CS-20_10 Block Paving
CS-20_11 Edge Restraints
CS-20_12 Timber Edging for Seal, Asphalt, Paving,
+
CS-21 Street Structures
CS-21_0 Street Structures
CS-21_1 Road Signs
CS-21_2 Safety Barriers
CS-21_3 Bollards and Removable Bollards
CS-21_4 Pedestrian Barrier Rails and Handrails
CS-21_5 Cycle Barriers and Racks
CS-21_6 Public Lighting
+
CS-22 Road Maintenance
CS-22_0 Road Maintenance
CS-22_1 Pot Holes
CS-22_2 Dig Outs
CS-22_3 Crack Sealing
CS-22_4 Surface Defects
CS-22_5 Edge Breaks
CS-22_6 Unsealed Shoulders
CS-22_7 Surface Detritus
CS-22_8 Edge Marker Posts
CS-22_9 Guardrails and Median Barriers
CS-22_10 Traffic Signs, Chevrons, Markers and Sigh
CS-22_11 Vegetation
+
CS-23 Grassing & Turfing
CS-23_0 Grassing and Turfing
CS-23_1 Preparation for Sowing or Turfing
CS-23_2 Topsoil Spreading/Re-spreading
CS-23_3 Fertiliser
CS-23_4 Sowing2
CS-23_5 Establishment of Sown Areas
CS-23_6 Weeds
CS-23_7 Defects Liability Period
+
CS-24 Vegetation Planting & Gardens
CS-24_0 Vegetation Planting and Gardens
CS-24_1 Soil and Fertility
CS-24_2 Mulch
CS-24_3 Juvenile Tree Planting
CS-24_4 Pruning
+
CS-25 Reinstatement
CS-25_0 Reinstatement
CS-25_1 Removed Items
+
Inspection & Testing Requirements
+
IT-1 General Provision
IT-1_1 General
IT-1_2 Minimum Requirements
IT-1_3 Applying for Inspections
IT-1_4 Asset Inspection/Testing Requirements
IT-1_5 Random Inspections
IT-1_6 Final Inspection
IT-1_7 Liability
+
IT-1 Appendix A - Inspection and Testing Summary
IT-1 Appendix A-1 Inspection and Testing Summary
+
IT-1 Appendix B-Company Requirements for Soils, Ea
IT-1 Appendix B_1 Minimum Requirements
+
IT-1 Appendix C - Closed Circuit Television Inspec
IT-1 Appendix C_1 General
IT-1 Appendix C_2 Engaging a CCTV Provider
IT-1 Appendix C_3 Responsibilities of all Parties
IT-1 Appendix C_4 Cleaning
IT-1 Appendix C_5 Water Flow in Pipe
IT-1 Appendix C_6 Defect Codes
IT-1 Appendix C_7 Failure Triggers
IT-1 Appendix C_8 Failures
IT-1 Appendix C_9 Major Defects Requiring Immediat
IT-1 Appendix C_10 Deliverables
+
IT-2 Streetscape
IT-2_1 Inspection
IT-2_2 Testing
+
IT-3 Reserves
IT-3_1 Inspection
IT-3_2 Testing
+
IT-4 Transportation Network
IT-4_1 Inspection
IT-4_2 Testing
+
IT_4 Appendix-Company Requirements for Pavement Te
IT-4-Appendix A_1 General
IS4_1 Inspection Sheet Vehicle Crossing
IS4_2 Inspection Sheet Pre-Seal
+
IT-5 Stormwater
IT-5_1 Inspection
IT-5_2 Testing
IS5_1 Inspection Sheet Stormwater Manhole and Pipe
1S5_2 Inspection Sheet Sump
+
IT-6 Wastewater
IT-6_1 Inspection
IT-6_2 Testing
IS6_1 Wastewater Manhole and Pipeline
TS6_1 Wastewater Low Pressure Air Test
TS6_2 Wastewater High Pressure Air Test
TS6_3 Wastewater Rising Main Pressure Test
TS6_4 Manhole Infiltration Test
+
IT-7 Water Supply
IT-7_1 Inspection
IT-7_2 Testing
IS7_1 Inspection Sheet-Hydrant
IS7_2 Inspection Sheet - Valve
IS7_3 Inspection Sheet - Water Connection
TS7_2 Disinfection Mixture
+
IT-8 Public Lighting
IT-8_1 Inspection
IT-8_2 Testing
+
IT-9 Network Utilities
IT-9_1 Inspection
IT-9_2 Testing
AC-4 Type 2 ACR Application Checklist - Development Completion Report
Quality Assurance Information Requirements
>
QA-5 Final Sign Off (s224c) Application Requiremen
>
AC-4 Type 2 ACR Application Checklist