Tauranga City Council IDC
GO
  • Home
  • +General
    • +GEN-1 Introduction
      • GEN-1_1 Philosophy
      • GEN-1_2 Scope/Applicability
      • GEN-1_3 IDC Layout
      • GEN-1_4 IDC Availability
      • GEN-1_5 Statutory Requirements
      • GEN-1_6 Relationship Between the IDC and Resource
      • GEN-1_7 Relationship Between the IDC and Building
      • GEN-1_8 Implementation of the IDC
      • GEN-1_9 Standards
      • GEN-1_10 Other Authorities
    • +GEN-2 Strategic Alignment
      • GEN-2_1 General
      • GEN-2_2 Smartgrowth Strategy and Implementation Pl
      • GEN-2_3 Smartgrowth's Impact on the IDC
    • +GEN-3 Level of Service
      • GEN-3-1 General
      • GEN-3-2 Context-Local Government Act 2002
      • GEN-3-3 How Councils Set Levels of Service
      • GEN-3-4 Maximums & Minimums
      • GEN-3-5 Geographical Differences in Levels of Se
      • GEN-3_6 Zoning and Land Use Differences in Levels
      • GEN-3-7 WBOPDC Level of Service
      • GEN-3-8 How to Change Levels of Service
      • GEN-3_9 Levels of Service and the IDC
    • +GEN-4 Definitions
      • GEN-4_1 General
      • GEN-4_2 Abbreviations
      • GEN-4_3 Definitions
    • +GEN-5 Document Control & Management
      • GEN-5_1 General
      • GEN-5_2 Amendment Processes
      • GEN-5_3 Advisory Panel
      • GEN-5_4 Adoption and Delegations
      • GEN-5_5 Notification
      • GEN-5_6 Table of Amendments
      • GEN-5_7 Publication
  • +Infrastructure Development Processes
    • +ID-1 Infrastructure Development Processes
      • ID-1_1 General
      • ID-1_2 Development Works associated with a Resourc
      • ID-1_3 Other Works not associated with a Resource
      • ID-1 - Appendix A Process Maps
    • PD-1 Lifecycle of an Asset Process Map
    • PD-2 Resource Consent Application Process Map
    • PD-3 Development Works Approval Process
    • PD-4 Amendment to DWA Approval
    • PD-5 Amendment to Approved Development Works Appli
    • PD-6 s223 Application Process Map
    • PD-7 s224(c) Application Process Map
    • PD-8 Approved Materials Process Map
  • -Quality Assurance Information Requirements
    • +QA_1 Resource Consent Application Requirements
      • QA-1_1 General
      • QA-1_2 Development Works
      • QA-1_3 Development Evaluation Report
      • QA-1_4 Minimum Information Requirements
      • QA-1_5 Compilation of the Report
      • QA-1_6 Drawing Information
      • QA-1_7 Supporting Documents
      • QA-1_8 Delivery Media - Digital Data
      • QA-1_9 Titling Convention
      • QA-1_10 Peer Review
      • QA-1 Appendix A Peer Review Requirements
      • AC_1 Application Checklist Development Evaluation
      • G1 Producer Statement Suitability of Land for Subd
    • +QA-2 Works Undertaken By or For a Council
      • QA-2_1 General
      • QA-2_2 Use of the IDC
      • QA-2_3 Exceptions to the IDC Technical Information
    • +QA-3 Development Works Approval
      • QA-3_1 General
      • QA-3_2 Level of Supervision of Construction for De
      • QA-3_3 Existing Infrastructure
      • QA-3_4 Compilation of the Development Works Approv
      • QA-3_5 Pre Application Meeting
      • QA-3_6 Minimum Information Requirements
      • QA-3_7 General Report Information
      • QA-3_8 Type 1 DWA Report
      • QA-3_9 Type 2 DWA Report Volume 1
      • QA-3_10 Type 2 DWA Report Volume 2
      • QA-3_11 Development Drawing Parameters
      • QA-3_12 Approval
      • QA-3_13 Liability
      • QA-3_14 Amendments to Approved Development Works A
      • QA-3_15 Processing Timeframe
      • QA-3_16 Delivery Media
      • QA-3_17 Titling Convention
      • QA-3_18 Approval of Contractor
      • QA-3 Appendix A Type 2 Development Work Approval R
      • DWA-01 Type 1 Works Approval Report Template
      • DWA-0_2 Type 2 Development Works Approval Report T
      • AC-2 Type 2 DWA Application Checklist-Development
      • AC-3 Type 1 ACR Application Checklist Development
      • AC-3_1 DWA and As-Built Submission Reserves
      • AC-3_2 DWA and As-Built Submission Transportation/
      • AC-3_3 DWA and As-Built Submission Stormwater
      • AC-3_4 DWA and As-Built Submission Wastewater
      • AC-3_5 DWA and As-Built Submission Water Supply
      • AC-3_6 DWA and As-Built Submission Natural Hazards
      • C1 Producer Statement Design
      • CM-1a Construction Monitoring Services
      • CM-1b Construction Monitoring Services
      • CM-1c Construction Monitoring Services
      • CM-1d Construction Monitoring Services
    • +QA-4 Survey Plan (s223) Approval
      • QA-4_1 General
    • +QA-5 Final Sign Off (s224c) Application Requiremen
      • QA-5_1 General
      • QA-5_2 Minimum Information Requirements
      • QA-5_3 Consent Compliance
      • QA-5_4 Development Completion Report
      • QA-5_5 As Built Information
      • QA-5_6 Supporting Documents
      • QA-5_7 Peer Review
      • QA-5_8 Delivery Media Digital Media
      • QA-5_9 Titling Convention
      • DCR-0_1 Type 1 Development Completion Report Templ
      • DCR-0_2 Type 2 Development Completion Report Templ
      • G2 Producer Statement Suitability of Land for Buil
      • G3 Summary of Geotechnical Data for Individual Lot
      • G4 Geotechnical Checklist Geotechnical Reporting
      • AC-2 DWA and As-Built Submission
      • AC-3 Type 1 ACR Application Checklist
      • AC-3_1 DWA and As-Built Submission Reserves
      • AC-3_2 DWA and As-Built Submission Transportation/
      • AC-3_3 DWA and As-Built Submission Stormwater
      • AC-3_4 DWA and As-Built Submission Wastewater
      • AC-3_5 DWA and As-Built Submission Water Supply
      • AC-3_6 DWA and As-Built Submission Natural Hazards
      • C2 Streetscape Construction Certification
      • C3 Reserves Construction Certification
      • C4 Transportation Construction Certification
      • C5 Stormwater Construction Certification
      • C6 Wastewater Construction Certification
      • C7 Water Supply Construction Certification
      • C9 Network Utilities Construction Certification
      • C10 Producer Statement Completed Construction Work
      • AC-4 Type 2 ACR Application Checklist
      • AC-5 Application Checklist s224 Application
      • AR-1 Infrastructure Asset Register
    • +QA-6 As-Built Information
      • QA-6_1 General
      • QA-6_2 Minimum Requirements
      • QA-6_3 Provision of As-Builts
      • QA-6_4 As-Built Information Types
      • QA-6_5 As-Built Software Requirements
      • QA-6_6 Timing of As-Built Delivery
      • QA-6_7 Council's As-Built Process
      • QA-6_8 As-Built Information Accuracy
      • QA-6_9 Fees and Charges
      • QA-6_10 Project Information
      • QA-6_11 Coordinates and Levels
      • QA-6_12 Hardcopy (PDF) As-Built Plans
      • QA-6_13 Benchmarks
      • QA-6_14 Delivery Media for as-Built Plans and Supp
      • QA-6_15 Tilting Convention
    • -QA-7 Bonds and Maintenance Fee
      • QA-7_1 General
      • QA-7_2 Landscaping: Maintenance Works and Incomple
      • QA-7_3 Other Bonds
      • QA-7_4 Bonded Works
      • QA-7_5 Release of Bond
      • QA-7_6 Non Peformance
      • QA-7_7 Landscaping: Maintenance Works Handover Fee
      • QA-7 - Appendix A Landscaping: Maintenance Works B
      • QA-7 - Appendix B Landscaping: Incomplete Works Bo
      • QA-7 - Appendix C Landscaping: Maintenance Works H
      • B1 Bond Form
      • B2 Bond Form-Schedule of Works
      • MF1 Maintenance Fee Form
      • MF2 Maintenance Fee Form-Schedule of Works
    • QA-8 Building Consent Considerations
  • +Design Standards
    • +DS-1 General Provisions
      • DS-1_1 General
      • DS-1_2 Minimum Requirements
      • DS-1_3 Alternative Design
      • DS-1_4 Culture and Heritage
      • DS-1_5 Health & Safety
      • DS-1_6 Pollution
      • DS-1_7 Waste Minimisation
      • DS-1_8 Ground Conditions
      • DS-1_9 Sustainable Development
      • DS-1_10 Development by Urban Design
      • DS-1_11 Core Design Principles
      • DS-1_12 Neighbourhood Context and Site Analysis
      • DS-1_13 Design with the Environment
      • DS-1_14 Managing Earthworks
      • DS-1_15 Movement and Access
      • DS-1_16 Open Spaces
      • DS-1_17 Streetscape
      • DS-1_18 Public Transport Network - Bus Routes
      • DS-1-19 Pedestrians and Cyclists
      • DS-1_20 Infrastructure Stormwater Management and L
      • DS-1_21 Putting it all Together
      • DS-1_22 Easements
      • DS-1_23 Tauranga Waterfront and CBD Specific Desig
      • DS-1 Appendix A - Associated Standards
    • +DS-2 Streetscape
      • DS-2_1 General
      • DS-2_2 Minimum Requirements
      • DS-2_3 Regional Council Requirements
      • DS-2_4 Design
      • DS-2_5 Topsoil and Grassing
      • DS-2_6 Street Gardens
      • DS-2_7 Street Trees
      • DS-2_8 Street Tree Location
      • DS-2_9 Species Selection
      • DS-2_10 Quality Control
      • DS-2_11 Open Space Furniture and Structures
      • DS-2_12 Irrigation
      • DS-2_13 Incomplete Works Bond
      • DS-2-Appendix A-Associated Standards
    • +DS-3 Reserves
      • DS-3_1 General
      • DS-3_2 Minimum Requirements
      • DS-3_3 Regional Council Requirements
      • DS-3_4 Design
      • DS-3_5 Further Considerations
      • DS-3-Appendix A - Associated Standards
    • +DS-4 Transportation Network
      • DS-4_1 General
      • DS-4_2 Minimum Requirements
      • DS-4_3 Regional Council Requirements
      • DS-4_4 Design
      • +DS-4_5 Conveyance
        • Table-1-design-requirements-for-various-road-class
      • DS-4_6 Marking and Signs
      • DS-4_7 Connection
      • DS-4_8 Berm Features
      • DS-4_9 Further Considerations
      • DS-4 - Appendix A - Associated Standards
      • DS-4 - Appendix B - Flexible Pavement Design Chart
      • DS-4 - Appendix C - Street Naming and Sign Standar
      • DS-4 - Appendix D - Safety Audits
    • +DS-5 Stormwater
      • DS-5_1 General
      • DS-5_2 Minimum Requirements
      • DS-5_3 Regional Council Requirements
      • DS-5_4 Design
      • DS-5_5 Conveyance Primary and Secondary Systems
      • DS-5_6 Stormwater Treatment / Detention
      • DS-5_7 Stormwater Discharge
      • DS-5_8 Collection
      • DS-5_9 Further Considerations
      • DS-5 - Appendix A Associated Standards
      • DS-5 - Appendix B Design Rainfall Tables
      • DS-5 - Appendix C Rainfall Intensity Curves
      • DS-5 - Appendix D Rainfall Depth Information Sheet
      • DS-5 - Appendix E The Rational Method
      • DS-5 - Appendix F Disposal Of Stormwater By Ground
      • DS-5 - Appendix G Soakage Rate Worked Example
    • +DS-6 Wastewater
      • DS-6_1 General
      • DS-6_2 Minimum Requirements
      • DS-6_3 Regional Council Requirements
      • DS-6_4 Design
      • DS-6_5 Conveyance Wastewater System
      • DS-6_6 Collection
      • DS-6_7 Further Considerations
      • DS-6_8 Wastewater Treatment Design
      • DS-6_9 Wastewater Pump Stations
      • DS-6_10 Private Pump Stations
      • DS-6_11 Receiving Reticulation
      • DS-6_12 Rising Mains
      • DS-6_13 Pump Station Layout
      • DS-6_14 Fittings and Materials
      • DS-6_15 Pump Station Services
      • DS-6 Appendix A Associated Standards
    • +DS-7 Water Supply
      • DS-7_1 General
      • DS-7_2 Minimum Requirements
      • DS-7_3 Regional Council Requirements
      • DS-7_4 Non Council Supply
      • DS-7_5 Design
      • DS-7_6 Conveyance Reticulation Layout
      • DS-7_7 Key Operational Fittings
      • DS-7_8 Point of Supply
      • DS-7_9 Further Considerations
      • DS-7 Appendix A Associated Standards
      • DS-7 Appendix B Conceptual Hydraulic Operation of
    • +DS-8 Public Lighting
      • DS-8_1 General
      • DS-8_2 Minimum Requirements
      • DS-8_3 Regional-Council-Requirements
      • DS-8_4 Design
      • DS-8_5 Information Requirements
      • DS-8_6 Public Spaces
      • DS-8_7 Streetlighting
      • DS-8_8 Design Criteria
      • DS-8_9 Approved Materials
      • DS-8_10 Work Undertaken on Councils Network
      • DS-8-11 Installation
      • DS-8 - Appendix A Associated Standards
      • DS-8 - Appendix B Notable Differences between DS-8
      • DS-8 - Appendix C Lighting Design Submission Check
      • DS-8 - Appendix D Lighting Column Submission Check
      • DS-8 - Appendix E Lighting Column Evaluation Check
      • DS-8 Proposed examples for new Standard Drawings
    • +DS-9 Network Utilities
      • DS-9_1 General
      • DS-9_2 Minimum Requirements
      • DS-9_3 Regional Council Requirements
      • DS-9_4 Design
      • DS-9_5 Further Considerations
      • DS-9-Appendix A - Associated Standards
    • +DS-10 Natural Hazards & Earthworks
      • DS-10_1 General
      • DS-10_2 Landform Development
      • DS-10_3 Performance Criteria
      • DS-10_4 Landform Classification System
      • DS-10_5 Assessment Process
      • DS-10_6 Landform Professional Opinion
      • DS-10_7 Geo-Professional Accreditation System
      • DS-10_8 Earthworks
      • DS-10_9 Regional Council Requirements
      • DS-10_10 Design
      • DS-10_11 Boulder or Rock-Faced Slopes
      • DS-10_12 Infill (Secondary) Subdivision
      • DS-1_13 Companies for Soils and Earthworks Testing
      • DS-10_14 Data Sharing
      • DS-10 Appendix A Associated Standards
      • DS-10 Appendix B Landform Classification System
      • DS-10 Appendix C Geo Professional Accreditation Sy
      • DS-10 Appendix D Accredited Geo Professionals
      • DS-10 Appendix E Assessment and Reporting
      • DS-10 Appendix F Peer Review Requirements
      • DS-10 Appendix G Geotechnical Considerations for B
      • DS-10 Appendix H Geotechnical Requirements Summary
      • DS-10 Appendix I Liquefaction Hazard Map
    • +DS-11 Road Zone/Road Reserve Occupancy
      • DS-11_1 General
      • DS-11_2 Minimum Requirements
      • DS-11_3 Regional Council Requirements
      • DS-11_4 Corridor Manager
      • DS-11_5 Utility Operator
      • DS-11_6 Responsibility for Suppliers, Agents and C
      • DS-11_7 The Road Zone Occupancy Process
      • DS-11_8 Location of Utilities
      • DS-11_9 Design, Construction and Materials
      • DS-11-Appendix A - Associated Standards
      • DS-11-Appendix B - General Conditions
      • DS-11-Appendix C - Utility Operators
      • DS-11-Appendix D - Guide to Duct Colouring and S
    • DS-12 Building Consent Considerations (Under Const
  • +Standard Drawings
    • +SD-1 General Provisions
      • SD-1_1 General
      • SD-1_2 Use of the Standard Drawings
      • SD-1_3 Features of the Standard Drawings
      • SD-1_4 Perspective Drawings
      • SD-1_5 Central Business District Drawings
      • SD-1_6 Quality Assurance Drawings
      • +SD-1 Appendix A Schedule of Drawings
        • SD-1 Appendix A_1 Drawing Schedule
        • SD-1 Appendix A_2 General Drawings (GEN Series)
        • SD-1 Appendix A_3 Streetscape (200 Series)
        • SD-1 Appendix A_4 Reserves (300 Series)
        • SD-1 Appendix A_5 Transportation Network (400 Seri
        • SD-1 Appendix A_6 Stormwater (500 Series)
        • SD-1 Appendix A_7 Wastewater (600 Series)
        • SD-1 Appendix A_8 Water Supply (700 Series)
        • SD-1 Appendix A_9 Public Lighting (800 Series)
        • SD-1 Appendix A_10 Network Utilities (900 Series)
        • SD-1 Appendix A_11 Natural Hazards and Earthworks
        • SD-1 Appendix A_12 Wastewater Pump Stations (WBOPD
        • SD-1 Appendix A_13 Quality Assurance Drawings
    • +T100 Perspective Drawings
      • T101-Perspective Drawing
      • T102-Perspective Drawing
      • T103-Perspective Drawing
      • T104-Perspective Drawing
      • T105-Perspective Drawing
      • T106-Perspective Drawing
      • T107-Perspective Drawing
      • T108-Perspective Drawing
      • T109-Perspective Drawing
      • T110-Perspective Drawing
      • T111-Perspective Drawing
      • T112-Perspective Drawing
      • T113-Perspective Drawing
      • T114-Perspective Drawing
      • T115-Perspective Drawing
      • T116-Perspective Drawing
      • T117-Perspective Drawing
      • T118-Perspective Drawing
      • T119-Perspective Drawing
      • T120-Perspective Drawing
      • T121-Perspective Drawing
      • T122-Perspective Drawing
      • T123-Perspective Drawing
      • T124-Perspective Drawing
      • T125-Perspective Drawing
      • T126-Perspective Drawing
      • T130-Perspective Drawing
      • T131-Perspective Drawing
      • T132-Perspective Drawing
      • T133-Perspective Drawing
      • T134-Perspective Drawing
      • T135-Perspective Drawing
      • T140-Perspective Drawing
    • +T200 Streetscape
      • T203-Streetscape
      • T204-Streetscape
      • T205-Streetscape
      • T206-Streetscape
      • T207-Streetscape
      • T211-Streetscape
      • T215-Streetscape
      • T216-Streetscape
      • T220-Streetscape
      • T221-Streetscape
      • T225-Streetscape
      • T226-Streetscape
      • T240 Streetscape
      • T241 Streetscape
      • T242 Streetscape
      • T243 Streetscape
      • T244 Streetscape
      • T245 Streetscape
    • +T300 Reserves
      • T303-Reserves
      • T304-Reserves
      • T305-Reserves
      • T311-Reserves
      • T315-Reserves
      • T316-Reserves
      • T317-Reserves
      • T320-Reserves
      • T321-Reserves
      • T322-Reserves
      • T323-Reserves
      • T325-Reserves
      • T326-Reserves
      • T330-Reserves
      • T331-Reserves
      • T335-Reserves
      • T340-Reserves
      • T350-Reserves
    • +T400 Transport Network
      • T400-Transport Network
      • T405-Transport Network
      • T406-Transport Network
      • T410-Transport Network
      • T411-Transport Network
      • T412-Transport Network
      • T413-Transport Network
      • T414-Transport Network
      • T415-Transport Network
      • T416-Transport Network
      • T420-Transport Network
      • T421-Transport Network
      • T422-Transport Network
      • T423-Transport Network
      • T424-Transport Network
      • T425-Transport Network
      • T426-Transport Network
      • T427-Transport Network
      • T430-Transport Network
      • T431-Transport Network
      • T432-Transport Network
      • T433-Transport Network
      • T434-Transport Network
      • T440-Transport Network
      • T442-Transport Network
      • T443-Transport Network
      • T450-Transport Network
    • +T500 Stormwater
      • T501-Stormwater
      • T502-Stormwater
      • T503-Stormwater
      • T504-Stormwater
      • T505-Stormwater
      • T506-Stormwater
      • T507-Stormwater
      • T514-Stormwater
      • T520-Stormwater
      • T521-Stormwater
      • T523-Stormwater
      • T524-Stormwater
      • T525-Stormwater
      • T530-Stormwater
      • T531-Stormwater
      • T532-Stormwater
      • T533-Stormwater
      • T534-Stormwater
      • T535-Stormwater
      • T536-Stormwater
      • T537-Stormwater
      • T538-Stormwater
      • T539-Stormwater
      • T540-Stormwater
      • T541-Stormwater
      • T542-Stormwater
      • T543-Stormwater
      • T550-Stormwater
      • T551-Stormwater
      • T552-Stormwater
      • T553-Stormwater
      • T554-Stormwater
    • +T600 Wastewater
      • T601-Wastewater
      • T602-Wastewater
      • T603-Wastewater
      • T604-Wastewater
      • T605-Wastewater
      • T606-Wastewater
      • T607-Wastewater
      • T608-Wastewater
      • T609-Wastewater
      • T610-Wastewater
      • T611-Wastewater
      • T612-Wastewater
      • T613-Wastewater
      • T614-Wastewater
      • T620-Wastewater
      • T621-Wastewater
      • T630-Wastewater
      • T631-Wastewater
      • T632-Wastewater
      • T633-Wastewater
      • T634-Wastewater
      • T637-Wastewater
      • T638-Wastewater
      • T639-Wastewater
      • T640-Wastewater
      • T641-Wastewater
      • T642-Wastewater
      • T643-Wastewater
      • T651-Wastewater
      • T652-Wastewater
      • T653-Wastewater
      • T654-Wastewater
      • T660-Wastewater
      • T661-Wastewater
      • T662-Wastewater
      • T663-Wastewater
      • T664-Wastewater
      • T665-Wastewater
      • T666-Wastewater
      • T667-Wastewater
      • T668-Wastewater
      • T669-Wastewater
      • T670-Wastewater
      • T671-Wastewater
      • T672-Wastewater
      • T673-Wastewater
      • T674-Wastewater
      • T675-Wastewater
      • T676-Wastewater
      • T677-Wastewater
      • T678-Wastewater
      • T679-Wastewater
      • T680-Wastewater
      • T681-Wastewater
      • T682-Wastewater
      • T683-Wastewater
    • +T700 Water Supply
      • T700-Water Supply
      • T701-Water Supply
      • T705-Water Supply
      • T706-Water Supply
      • T707-Water Supply
      • T708-Water Supply
      • T709-Water Supply
      • T710-Water Supply
      • T713-Water Supply
      • T714-Water Supply
      • T715-Water Supply
      • T716-Water Supply
      • T717-Water Supply
      • T718-Water Supply
      • T719-Water Supply
      • T720-Water Supply
      • T721-Water Supply
      • T722-Water Supply
      • T723-Water Supply
      • T724-Water Supply
      • T727-Water Supply
      • T728-Water Supply
      • T729-Water Supply
      • T730-Water Supply
      • T731-Water Supply
      • T732-Water Supply
      • T733-Water Supply
      • T734-Water Supply
      • T735-Water Supply
      • T736-Water Supply
      • T737-Water Supply
      • T738-Water Supply
      • T739-Water Supply
      • T740-Water Supply
      • T741-Water Supply
      • T742-Water Supply
      • T743-Water Supply
      • T744-Water Supply
      • T751-Water Supply
      • T753-Water Supply
      • T754-Water Supply
    • +T800 Public Lighting
      • T801-Public-Lighting
    • +AB As-Built Drawings
      • AB-01-As-Built Drawings
      • AB-02-As-Built Drawings
      • AB-03-As-Built Drawings
      • AB-04-As-Built Drawings
      • AB-100-As-Built Drawings
      • AB-200-As-Built Drawings
      • AB-400-As-Built Drawings
      • AB-500-As-Built Drawings
      • AB-600-As-Built Drawings
      • AB-700-As-Built Drawings
      • AB-800-As-Built Drawings
  • Approved Materials
  • +Construction Standards
    • +CS-1 General
      • CS-1_0 General Provisions
      • CS-1_1 Minimum Requirements
      • CS-1_2 Notifiable Works
      • CS-1_3 Road Zone Occupancy
      • CS-1_4 Health & Safety
      • CS-1_5 Confined Spaces
      • CS-1_6 Public Protection
      • CS-1_7 Culture and Heritage
      • CS-1_8 Environmental or Property Damaged
      • CS-1_9 Pollution
      • CS-1_10 Existing Utility Services
      • CS-1_11 Protection of Trees or Other Features
      • CS-1_12 Dust Control
      • CS-1_13 Nuisance
      • CS-1_14 Emergency
      • CS-1_15 Alternative Construction Methods
      • CS-1_16 Setting Out
      • CS-1_17 Inspection and Testing
      • CS-1_18 As-Built Information
    • +CS-2 Site Clearance
      • CS-2_0 Site Clearance
      • CS-2_1 Clearing and Removal of Vegetation and Rub
      • CS-2_2 Burning
    • +CS-3 Earthworks
      • CS-3_0 Earthworks
      • CS-3_1 Supervision
      • CS-3_2 Earthworks Management Plan
      • CS-3_3 Drainage Control
      • CS_3_4 Erosion & Sediment Control
      • CS-3_5 Protection & Maintenance of Works
      • CS-3_6 Modification to Control Systems
      • CS-3_7 Tolerances
      • CS-3_8 Inspections and Approvals
      • CS-3_9 Haul Roads
      • CS-3_10 Temporary Stockpiles
    • +CS-4 Excavation
      • CS_4_0 Excavation
      • CS-4_1 Stripping
      • CS-4_2 Removal of Topsoil
      • CS-4_3 Excavation Management
      • CS-4_4 Over Excavation
      • CS-4_5 Cut to Waste
      • CS-4_6 Cut to Fill
      • CS-4_7 Slips
      • CS-4_8 General Undercutting
      • CS-4_9 Protection of Subgrade
      • CS-4_10 Undercut for Shear Keys, Embankments and F
    • +CS-5 Excavation in Trench
      • CS-5_0 Excavation in Trench
      • CS-5_1 Over Excavation
      • CS-5_2 Trench Protection
      • CS-5_3 Groundwater
    • +CS-6 Fill
      • CS-6_0 Fill
      • CS-6_1 Conditioning and Spreading of Fill
      • CS-6_2 Placement of Shear Key and Embankment Under
      • CS-6_3 Compaction
      • CS-6_4 Compaction Trials
      • CS-6_5 Compaction Standards and Testing
      • CS-6_6 Shaping
      • CS-6_7 Topsoil Respreading
    • +CS-7 Bedding & Backfill
      • CS-7_0 Bedding and Backfill
      • CS-7_1 Backfill Material
      • CS-7_2 Compaction
    • +CS-8 Subsoil Drainage for Earthworks & Roads
      • CS-8_0 Subsoil Drainage for Earthworks and Roads
    • +CS-9 Pipework
      • CS-9_0 Pipework
      • CS-9_1 Jointing
      • CS-9_2 Laterals and End Caps
      • CS-9_3 Service Connections
      • CS-9_4 Tolerances
      • CS-9_5 Identification and Marking of Pipelines
      • CS-9_6 Cleaning and Disinfection of Watermains
      • CS-9_7 Connection to an Existing Network
    • +CS-10 Pipe Fittings
      • CS-10_0 Pipe Fittings
      • CS-10_1 Fire Hydrants
      • CS-10_2 Valves
      • CS-10_3 Anchor and Thrust Blocks
    • +CS-11 Manholes & Rodding Eyes
      • CS-11_0 Manholes and Rodding Eyes
      • CS-11_1 Invert Levels
      • CS-11_2 Channels and Benching
      • CS-11_3 Flexible Joints
      • CS-11_4 Sealing of Manholes
      • CS-11_5 Completion of Manholes
      • CS-11_6 Drop Connection
      • CS-11_7 Access Steps
      • CS-11_8 Rodding Eyes
    • +CS-12 Sumps
      • CS-12_0 Sumps
    • +CS-13 Trenchless Technology
      • CS-13_0 Trenchless Technology
      • CS-13_1 Location of Existing Services
      • CS-13_2 Alignment
      • CS-13_3 Directional Drilling
      • CS-13_4 Pipe Thrusting
      • CS-13_5 Guided Boring/Auger Boring
      • CS-13_6 Pipe Bursting
      • CS-13_7 Pipe Splitting
      • CS-13_8 Tolerances
      • CS-13_9 Damage
    • +CS-14 Road Ripping
      • CS-14_0 Road Ripping
      • CS-14_1 Ripping To Allow Placement of Additional B
      • CS-14_2 Use of Ripped Material
      • CS-14_3 Placing, Shaping and Compacting of Reused
      • CS-14_4 Asphalt Patch Surface
    • +CS-15 Road Pavement Layers
      • CS-15_0 Road Pavement Layers
      • CS-15_1 Subgrade Layer
      • CS-15_2 Sub-Base Layer
      • CS-15_3 Basecourse Layer
      • CS-15_4 Cement Stabiliation of Pavement Layers
    • +CS-16 Kerb & Channel
      • CS-16_0 Kerb and Channel
      • CS-16_1 Kerb and Channel Removal
      • CS-16_2 Saw Cutting
      • CS-16_3 Excavation to Pavement Depth
      • CS-16_4 Subgrade Preparation
      • CS-16_5 Kerb and Channel Foundation
      • CS-16_6 Kerb and Channel Placing
      • CS-16_7 Carriageway Reinstatement
    • +CS-17 Concrete Work
      • CS-17_0 Concrete Work
      • CS-17_1 Formwork
      • CS-17_2 Concrete Mix and Proportions
      • CS-17_3 Placing Concrete
      • CS-17_4 Reinforcement
      • CS-17_5 Curing Of Concrete
      • CS-17_6 Machine Laid Kerb and Channel
      • CS-17_7 Finished Work
      • CS-17_8 Contraction/Expansion Joints
      • CS-17_9 Backfilling Against Concrete Work
      • CS-17_10 Surface Finish (Footpath and Vehicle Cros
    • +CS-18 Carriageway Surfacing
      • CS-18_0 Carriageway Surfacing
      • CS-18_1 Two Coat Seal (First Coat with Wet locking
      • CS-18_2 Two Coat Seal and Open Graded Porous Aspha
      • CS-18_3 Single Coat Membrane Seal and Asphaltic Co
      • CS-18_4 Requirements after Chip Sealing
      • CS-18_5 Removal of Surplus Chip
      • CS-18_6 Protection and Repairs of the Seal Coat
    • +CS-19 Roadmarking
      • CS-19_0 Roadmarking
    • +CS-20 Berm Features
      • CS-20_0 Berm Features
      • CS-20_1 Alignments, Line and Levels
      • CS-20_2 Break-out, Removal and Disposal of Existin
      • CS-20_3 Excavation to Footpath Depth
      • CS-20_4 Subgrade Preperation
      • CS-20_5 Pavement-Course for Berm Features
      • CS-20_6 Concrete Footpaths and Vehicle Crossings
      • CS-20_7 Contraction/Expansion Joints
      • CS-20_8 Asphalt Surfacing
      • CS-20_9 Asphalt Overlay
      • CS-20_10 Block Paving
      • CS-20_11 Edge Restraints
      • CS-20_12 Timber Edging for Seal, Asphalt, Paving,
    • +CS-21 Street Structures
      • CS-21_0 Street Structures
      • CS-21_1 Road Signs
      • CS-21_2 Safety Barriers
      • CS-21_3 Bollards and Removable Bollards
      • CS-21_4 Pedestrian Barrier Rails and Handrails
      • CS-21_5 Cycle Barriers and Racks
      • CS-21_6 Public Lighting
    • +CS-22 Road Maintenance
      • CS-22_0 Road Maintenance
      • CS-22_1 Pot Holes
      • CS-22_2 Dig Outs
      • CS-22_3 Crack Sealing
      • CS-22_4 Surface Defects
      • CS-22_5 Edge Breaks
      • CS-22_6 Unsealed Shoulders
      • CS-22_7 Surface Detritus
      • CS-22_8 Edge Marker Posts
      • CS-22_9 Guardrails and Median Barriers
      • CS-22_10 Traffic Signs, Chevrons, Markers and Sigh
      • CS-22_11 Vegetation
    • +CS-23 Grassing & Turfing
      • CS-23_0 Grassing and Turfing
      • CS-23_1 Preparation for Sowing or Turfing
      • CS-23_2 Topsoil Spreading/Re-spreading
      • CS-23_3 Fertiliser
      • CS-23_4 Sowing2
      • CS-23_5 Establishment of Sown Areas
      • CS-23_6 Weeds
      • CS-23_7 Defects Liability Period
    • +CS-24 Vegetation Planting & Gardens
      • CS-24_0 Vegetation Planting and Gardens
      • CS-24_1 Soil and Fertility
      • CS-24_2 Mulch
      • CS-24_3 Juvenile Tree Planting
      • CS-24_4 Pruning
    • +CS-25 Reinstatement
      • CS-25_0 Reinstatement
      • CS-25_1 Removed Items
  • +Inspection & Testing Requirements
    • +IT-1 General Provision
      • IT-1_1 General
      • IT-1_2 Minimum Requirements
      • IT-1_3 Applying for Inspections
      • IT-1_4 Asset Inspection/Testing Requirements
      • IT-1_5 Random Inspections
      • IT-1_6 Final Inspection
      • IT-1_7 Liability
      • +IT-1 Appendix A - Inspection and Testing Summary
        • IT-1 Appendix A-1 Inspection and Testing Summary
      • +IT-1 Appendix B-Company Requirements for Soils, Ea
        • IT-1 Appendix B_1 Minimum Requirements
      • +IT-1 Appendix C - Closed Circuit Television Inspec
        • IT-1 Appendix C_1 General
        • IT-1 Appendix C_2 Engaging a CCTV Provider
        • IT-1 Appendix C_3 Responsibilities of all Parties
        • IT-1 Appendix C_4 Cleaning
        • IT-1 Appendix C_5 Water Flow in Pipe
        • IT-1 Appendix C_6 Defect Codes
        • IT-1 Appendix C_7 Failure Triggers
        • IT-1 Appendix C_8 Failures
        • IT-1 Appendix C_9 Major Defects Requiring Immediat
        • IT-1 Appendix C_10 Deliverables
    • +IT-2 Streetscape
      • IT-2_1 Inspection
      • IT-2_2 Testing
    • +IT-3 Reserves
      • IT-3_1 Inspection
      • IT-3_2 Testing
    • +IT-4 Transportation Network
      • IT-4_1 Inspection
      • IT-4_2 Testing
      • +IT_4 Appendix-Company Requirements for Pavement Te
        • IT-4-Appendix A_1 General
      • IS4_1 Inspection Sheet Vehicle Crossing
      • IS4_2 Inspection Sheet Pre-Seal
    • +IT-5 Stormwater
      • IT-5_1 Inspection
      • IT-5_2 Testing
      • IS5_1 Inspection Sheet Stormwater Manhole and Pipe
      • 1S5_2 Inspection Sheet Sump
    • +IT-6 Wastewater
      • IT-6_1 Inspection
      • IT-6_2 Testing
      • IS6_1 Wastewater Manhole and Pipeline
      • TS6_1 Wastewater Low Pressure Air Test
      • TS6_2 Wastewater High Pressure Air Test
      • TS6_3 Wastewater Rising Main Pressure Test
      • TS6_4 Manhole Infiltration Test
    • +IT-7 Water Supply
      • IT-7_1 Inspection
      • IT-7_2 Testing
      • IS7_1 Inspection Sheet-Hydrant
      • IS7_2 Inspection Sheet - Valve
      • IS7_3 Inspection Sheet - Water Connection
      • TS7_2 Disinfection Mixture
    • +IT-8 Public Lighting
      • IT-8_1 Inspection
      • IT-8_2 Testing
    • +IT-9 Network Utilities
      • IT-9_1 Inspection
      • IT-9_2 Testing
  • Facebook
  • Twitter
  • Linkedin
GO
  • Home
  • +General
    • +GEN-1 Introduction
      • GEN-1_1 Philosophy
      • GEN-1_2 Scope/Applicability
      • GEN-1_3 IDC Layout
      • GEN-1_4 IDC Availability
      • GEN-1_5 Statutory Requirements
      • GEN-1_6 Relationship Between the IDC and Resource
      • GEN-1_7 Relationship Between the IDC and Building
      • GEN-1_8 Implementation of the IDC
      • GEN-1_9 Standards
      • GEN-1_10 Other Authorities
    • +GEN-2 Strategic Alignment
      • GEN-2_1 General
      • GEN-2_2 Smartgrowth Strategy and Implementation Pl
      • GEN-2_3 Smartgrowth's Impact on the IDC
    • +GEN-3 Level of Service
      • GEN-3-1 General
      • GEN-3-2 Context-Local Government Act 2002
      • GEN-3-3 How Councils Set Levels of Service
      • GEN-3-4 Maximums & Minimums
      • GEN-3-5 Geographical Differences in Levels of Se
      • GEN-3_6 Zoning and Land Use Differences in Levels
      • GEN-3-7 WBOPDC Level of Service
      • GEN-3-8 How to Change Levels of Service
      • GEN-3_9 Levels of Service and the IDC
    • +GEN-4 Definitions
      • GEN-4_1 General
      • GEN-4_2 Abbreviations
      • GEN-4_3 Definitions
    • +GEN-5 Document Control & Management
      • GEN-5_1 General
      • GEN-5_2 Amendment Processes
      • GEN-5_3 Advisory Panel
      • GEN-5_4 Adoption and Delegations
      • GEN-5_5 Notification
      • GEN-5_6 Table of Amendments
      • GEN-5_7 Publication
  • +Infrastructure Development Processes
    • +ID-1 Infrastructure Development Processes
      • ID-1_1 General
      • ID-1_2 Development Works associated with a Resourc
      • ID-1_3 Other Works not associated with a Resource
      • ID-1 - Appendix A Process Maps
    • PD-1 Lifecycle of an Asset Process Map
    • PD-2 Resource Consent Application Process Map
    • PD-3 Development Works Approval Process
    • PD-4 Amendment to DWA Approval
    • PD-5 Amendment to Approved Development Works Appli
    • PD-6 s223 Application Process Map
    • PD-7 s224(c) Application Process Map
    • PD-8 Approved Materials Process Map
  • -Quality Assurance Information Requirements
    • +QA_1 Resource Consent Application Requirements
      • QA-1_1 General
      • QA-1_2 Development Works
      • QA-1_3 Development Evaluation Report
      • QA-1_4 Minimum Information Requirements
      • QA-1_5 Compilation of the Report
      • QA-1_6 Drawing Information
      • QA-1_7 Supporting Documents
      • QA-1_8 Delivery Media - Digital Data
      • QA-1_9 Titling Convention
      • QA-1_10 Peer Review
      • QA-1 Appendix A Peer Review Requirements
      • AC_1 Application Checklist Development Evaluation
      • G1 Producer Statement Suitability of Land for Subd
    • +QA-2 Works Undertaken By or For a Council
      • QA-2_1 General
      • QA-2_2 Use of the IDC
      • QA-2_3 Exceptions to the IDC Technical Information
    • +QA-3 Development Works Approval
      • QA-3_1 General
      • QA-3_2 Level of Supervision of Construction for De
      • QA-3_3 Existing Infrastructure
      • QA-3_4 Compilation of the Development Works Approv
      • QA-3_5 Pre Application Meeting
      • QA-3_6 Minimum Information Requirements
      • QA-3_7 General Report Information
      • QA-3_8 Type 1 DWA Report
      • QA-3_9 Type 2 DWA Report Volume 1
      • QA-3_10 Type 2 DWA Report Volume 2
      • QA-3_11 Development Drawing Parameters
      • QA-3_12 Approval
      • QA-3_13 Liability
      • QA-3_14 Amendments to Approved Development Works A
      • QA-3_15 Processing Timeframe
      • QA-3_16 Delivery Media
      • QA-3_17 Titling Convention
      • QA-3_18 Approval of Contractor
      • QA-3 Appendix A Type 2 Development Work Approval R
      • DWA-01 Type 1 Works Approval Report Template
      • DWA-0_2 Type 2 Development Works Approval Report T
      • AC-2 Type 2 DWA Application Checklist-Development
      • AC-3 Type 1 ACR Application Checklist Development
      • AC-3_1 DWA and As-Built Submission Reserves
      • AC-3_2 DWA and As-Built Submission Transportation/
      • AC-3_3 DWA and As-Built Submission Stormwater
      • AC-3_4 DWA and As-Built Submission Wastewater
      • AC-3_5 DWA and As-Built Submission Water Supply
      • AC-3_6 DWA and As-Built Submission Natural Hazards
      • C1 Producer Statement Design
      • CM-1a Construction Monitoring Services
      • CM-1b Construction Monitoring Services
      • CM-1c Construction Monitoring Services
      • CM-1d Construction Monitoring Services
    • +QA-4 Survey Plan (s223) Approval
      • QA-4_1 General
    • +QA-5 Final Sign Off (s224c) Application Requiremen
      • QA-5_1 General
      • QA-5_2 Minimum Information Requirements
      • QA-5_3 Consent Compliance
      • QA-5_4 Development Completion Report
      • QA-5_5 As Built Information
      • QA-5_6 Supporting Documents
      • QA-5_7 Peer Review
      • QA-5_8 Delivery Media Digital Media
      • QA-5_9 Titling Convention
      • DCR-0_1 Type 1 Development Completion Report Templ
      • DCR-0_2 Type 2 Development Completion Report Templ
      • G2 Producer Statement Suitability of Land for Buil
      • G3 Summary of Geotechnical Data for Individual Lot
      • G4 Geotechnical Checklist Geotechnical Reporting
      • AC-2 DWA and As-Built Submission
      • AC-3 Type 1 ACR Application Checklist
      • AC-3_1 DWA and As-Built Submission Reserves
      • AC-3_2 DWA and As-Built Submission Transportation/
      • AC-3_3 DWA and As-Built Submission Stormwater
      • AC-3_4 DWA and As-Built Submission Wastewater
      • AC-3_5 DWA and As-Built Submission Water Supply
      • AC-3_6 DWA and As-Built Submission Natural Hazards
      • C2 Streetscape Construction Certification
      • C3 Reserves Construction Certification
      • C4 Transportation Construction Certification
      • C5 Stormwater Construction Certification
      • C6 Wastewater Construction Certification
      • C7 Water Supply Construction Certification
      • C9 Network Utilities Construction Certification
      • C10 Producer Statement Completed Construction Work
      • AC-4 Type 2 ACR Application Checklist
      • AC-5 Application Checklist s224 Application
      • AR-1 Infrastructure Asset Register
    • +QA-6 As-Built Information
      • QA-6_1 General
      • QA-6_2 Minimum Requirements
      • QA-6_3 Provision of As-Builts
      • QA-6_4 As-Built Information Types
      • QA-6_5 As-Built Software Requirements
      • QA-6_6 Timing of As-Built Delivery
      • QA-6_7 Council's As-Built Process
      • QA-6_8 As-Built Information Accuracy
      • QA-6_9 Fees and Charges
      • QA-6_10 Project Information
      • QA-6_11 Coordinates and Levels
      • QA-6_12 Hardcopy (PDF) As-Built Plans
      • QA-6_13 Benchmarks
      • QA-6_14 Delivery Media for as-Built Plans and Supp
      • QA-6_15 Tilting Convention
    • -QA-7 Bonds and Maintenance Fee
      • QA-7_1 General
      • QA-7_2 Landscaping: Maintenance Works and Incomple
      • QA-7_3 Other Bonds
      • QA-7_4 Bonded Works
      • QA-7_5 Release of Bond
      • QA-7_6 Non Peformance
      • QA-7_7 Landscaping: Maintenance Works Handover Fee
      • QA-7 - Appendix A Landscaping: Maintenance Works B
      • QA-7 - Appendix B Landscaping: Incomplete Works Bo
      • QA-7 - Appendix C Landscaping: Maintenance Works H
      • B1 Bond Form
      • B2 Bond Form-Schedule of Works
      • MF1 Maintenance Fee Form
      • MF2 Maintenance Fee Form-Schedule of Works
    • QA-8 Building Consent Considerations
  • +Design Standards
    • +DS-1 General Provisions
      • DS-1_1 General
      • DS-1_2 Minimum Requirements
      • DS-1_3 Alternative Design
      • DS-1_4 Culture and Heritage
      • DS-1_5 Health & Safety
      • DS-1_6 Pollution
      • DS-1_7 Waste Minimisation
      • DS-1_8 Ground Conditions
      • DS-1_9 Sustainable Development
      • DS-1_10 Development by Urban Design
      • DS-1_11 Core Design Principles
      • DS-1_12 Neighbourhood Context and Site Analysis
      • DS-1_13 Design with the Environment
      • DS-1_14 Managing Earthworks
      • DS-1_15 Movement and Access
      • DS-1_16 Open Spaces
      • DS-1_17 Streetscape
      • DS-1_18 Public Transport Network - Bus Routes
      • DS-1-19 Pedestrians and Cyclists
      • DS-1_20 Infrastructure Stormwater Management and L
      • DS-1_21 Putting it all Together
      • DS-1_22 Easements
      • DS-1_23 Tauranga Waterfront and CBD Specific Desig
      • DS-1 Appendix A - Associated Standards
    • +DS-2 Streetscape
      • DS-2_1 General
      • DS-2_2 Minimum Requirements
      • DS-2_3 Regional Council Requirements
      • DS-2_4 Design
      • DS-2_5 Topsoil and Grassing
      • DS-2_6 Street Gardens
      • DS-2_7 Street Trees
      • DS-2_8 Street Tree Location
      • DS-2_9 Species Selection
      • DS-2_10 Quality Control
      • DS-2_11 Open Space Furniture and Structures
      • DS-2_12 Irrigation
      • DS-2_13 Incomplete Works Bond
      • DS-2-Appendix A-Associated Standards
    • +DS-3 Reserves
      • DS-3_1 General
      • DS-3_2 Minimum Requirements
      • DS-3_3 Regional Council Requirements
      • DS-3_4 Design
      • DS-3_5 Further Considerations
      • DS-3-Appendix A - Associated Standards
    • +DS-4 Transportation Network
      • DS-4_1 General
      • DS-4_2 Minimum Requirements
      • DS-4_3 Regional Council Requirements
      • DS-4_4 Design
      • +DS-4_5 Conveyance
        • Table-1-design-requirements-for-various-road-class
      • DS-4_6 Marking and Signs
      • DS-4_7 Connection
      • DS-4_8 Berm Features
      • DS-4_9 Further Considerations
      • DS-4 - Appendix A - Associated Standards
      • DS-4 - Appendix B - Flexible Pavement Design Chart
      • DS-4 - Appendix C - Street Naming and Sign Standar
      • DS-4 - Appendix D - Safety Audits
    • +DS-5 Stormwater
      • DS-5_1 General
      • DS-5_2 Minimum Requirements
      • DS-5_3 Regional Council Requirements
      • DS-5_4 Design
      • DS-5_5 Conveyance Primary and Secondary Systems
      • DS-5_6 Stormwater Treatment / Detention
      • DS-5_7 Stormwater Discharge
      • DS-5_8 Collection
      • DS-5_9 Further Considerations
      • DS-5 - Appendix A Associated Standards
      • DS-5 - Appendix B Design Rainfall Tables
      • DS-5 - Appendix C Rainfall Intensity Curves
      • DS-5 - Appendix D Rainfall Depth Information Sheet
      • DS-5 - Appendix E The Rational Method
      • DS-5 - Appendix F Disposal Of Stormwater By Ground
      • DS-5 - Appendix G Soakage Rate Worked Example
    • +DS-6 Wastewater
      • DS-6_1 General
      • DS-6_2 Minimum Requirements
      • DS-6_3 Regional Council Requirements
      • DS-6_4 Design
      • DS-6_5 Conveyance Wastewater System
      • DS-6_6 Collection
      • DS-6_7 Further Considerations
      • DS-6_8 Wastewater Treatment Design
      • DS-6_9 Wastewater Pump Stations
      • DS-6_10 Private Pump Stations
      • DS-6_11 Receiving Reticulation
      • DS-6_12 Rising Mains
      • DS-6_13 Pump Station Layout
      • DS-6_14 Fittings and Materials
      • DS-6_15 Pump Station Services
      • DS-6 Appendix A Associated Standards
    • +DS-7 Water Supply
      • DS-7_1 General
      • DS-7_2 Minimum Requirements
      • DS-7_3 Regional Council Requirements
      • DS-7_4 Non Council Supply
      • DS-7_5 Design
      • DS-7_6 Conveyance Reticulation Layout
      • DS-7_7 Key Operational Fittings
      • DS-7_8 Point of Supply
      • DS-7_9 Further Considerations
      • DS-7 Appendix A Associated Standards
      • DS-7 Appendix B Conceptual Hydraulic Operation of
    • +DS-8 Public Lighting
      • DS-8_1 General
      • DS-8_2 Minimum Requirements
      • DS-8_3 Regional-Council-Requirements
      • DS-8_4 Design
      • DS-8_5 Information Requirements
      • DS-8_6 Public Spaces
      • DS-8_7 Streetlighting
      • DS-8_8 Design Criteria
      • DS-8_9 Approved Materials
      • DS-8_10 Work Undertaken on Councils Network
      • DS-8-11 Installation
      • DS-8 - Appendix A Associated Standards
      • DS-8 - Appendix B Notable Differences between DS-8
      • DS-8 - Appendix C Lighting Design Submission Check
      • DS-8 - Appendix D Lighting Column Submission Check
      • DS-8 - Appendix E Lighting Column Evaluation Check
      • DS-8 Proposed examples for new Standard Drawings
    • +DS-9 Network Utilities
      • DS-9_1 General
      • DS-9_2 Minimum Requirements
      • DS-9_3 Regional Council Requirements
      • DS-9_4 Design
      • DS-9_5 Further Considerations
      • DS-9-Appendix A - Associated Standards
    • +DS-10 Natural Hazards & Earthworks
      • DS-10_1 General
      • DS-10_2 Landform Development
      • DS-10_3 Performance Criteria
      • DS-10_4 Landform Classification System
      • DS-10_5 Assessment Process
      • DS-10_6 Landform Professional Opinion
      • DS-10_7 Geo-Professional Accreditation System
      • DS-10_8 Earthworks
      • DS-10_9 Regional Council Requirements
      • DS-10_10 Design
      • DS-10_11 Boulder or Rock-Faced Slopes
      • DS-10_12 Infill (Secondary) Subdivision
      • DS-1_13 Companies for Soils and Earthworks Testing
      • DS-10_14 Data Sharing
      • DS-10 Appendix A Associated Standards
      • DS-10 Appendix B Landform Classification System
      • DS-10 Appendix C Geo Professional Accreditation Sy
      • DS-10 Appendix D Accredited Geo Professionals
      • DS-10 Appendix E Assessment and Reporting
      • DS-10 Appendix F Peer Review Requirements
      • DS-10 Appendix G Geotechnical Considerations for B
      • DS-10 Appendix H Geotechnical Requirements Summary
      • DS-10 Appendix I Liquefaction Hazard Map
    • +DS-11 Road Zone/Road Reserve Occupancy
      • DS-11_1 General
      • DS-11_2 Minimum Requirements
      • DS-11_3 Regional Council Requirements
      • DS-11_4 Corridor Manager
      • DS-11_5 Utility Operator
      • DS-11_6 Responsibility for Suppliers, Agents and C
      • DS-11_7 The Road Zone Occupancy Process
      • DS-11_8 Location of Utilities
      • DS-11_9 Design, Construction and Materials
      • DS-11-Appendix A - Associated Standards
      • DS-11-Appendix B - General Conditions
      • DS-11-Appendix C - Utility Operators
      • DS-11-Appendix D - Guide to Duct Colouring and S
    • DS-12 Building Consent Considerations (Under Const
  • +Standard Drawings
    • +SD-1 General Provisions
      • SD-1_1 General
      • SD-1_2 Use of the Standard Drawings
      • SD-1_3 Features of the Standard Drawings
      • SD-1_4 Perspective Drawings
      • SD-1_5 Central Business District Drawings
      • SD-1_6 Quality Assurance Drawings
      • +SD-1 Appendix A Schedule of Drawings
        • SD-1 Appendix A_1 Drawing Schedule
        • SD-1 Appendix A_2 General Drawings (GEN Series)
        • SD-1 Appendix A_3 Streetscape (200 Series)
        • SD-1 Appendix A_4 Reserves (300 Series)
        • SD-1 Appendix A_5 Transportation Network (400 Seri
        • SD-1 Appendix A_6 Stormwater (500 Series)
        • SD-1 Appendix A_7 Wastewater (600 Series)
        • SD-1 Appendix A_8 Water Supply (700 Series)
        • SD-1 Appendix A_9 Public Lighting (800 Series)
        • SD-1 Appendix A_10 Network Utilities (900 Series)
        • SD-1 Appendix A_11 Natural Hazards and Earthworks
        • SD-1 Appendix A_12 Wastewater Pump Stations (WBOPD
        • SD-1 Appendix A_13 Quality Assurance Drawings
    • +T100 Perspective Drawings
      • T101-Perspective Drawing
      • T102-Perspective Drawing
      • T103-Perspective Drawing
      • T104-Perspective Drawing
      • T105-Perspective Drawing
      • T106-Perspective Drawing
      • T107-Perspective Drawing
      • T108-Perspective Drawing
      • T109-Perspective Drawing
      • T110-Perspective Drawing
      • T111-Perspective Drawing
      • T112-Perspective Drawing
      • T113-Perspective Drawing
      • T114-Perspective Drawing
      • T115-Perspective Drawing
      • T116-Perspective Drawing
      • T117-Perspective Drawing
      • T118-Perspective Drawing
      • T119-Perspective Drawing
      • T120-Perspective Drawing
      • T121-Perspective Drawing
      • T122-Perspective Drawing
      • T123-Perspective Drawing
      • T124-Perspective Drawing
      • T125-Perspective Drawing
      • T126-Perspective Drawing
      • T130-Perspective Drawing
      • T131-Perspective Drawing
      • T132-Perspective Drawing
      • T133-Perspective Drawing
      • T134-Perspective Drawing
      • T135-Perspective Drawing
      • T140-Perspective Drawing
    • +T200 Streetscape
      • T203-Streetscape
      • T204-Streetscape
      • T205-Streetscape
      • T206-Streetscape
      • T207-Streetscape
      • T211-Streetscape
      • T215-Streetscape
      • T216-Streetscape
      • T220-Streetscape
      • T221-Streetscape
      • T225-Streetscape
      • T226-Streetscape
      • T240 Streetscape
      • T241 Streetscape
      • T242 Streetscape
      • T243 Streetscape
      • T244 Streetscape
      • T245 Streetscape
    • +T300 Reserves
      • T303-Reserves
      • T304-Reserves
      • T305-Reserves
      • T311-Reserves
      • T315-Reserves
      • T316-Reserves
      • T317-Reserves
      • T320-Reserves
      • T321-Reserves
      • T322-Reserves
      • T323-Reserves
      • T325-Reserves
      • T326-Reserves
      • T330-Reserves
      • T331-Reserves
      • T335-Reserves
      • T340-Reserves
      • T350-Reserves
    • +T400 Transport Network
      • T400-Transport Network
      • T405-Transport Network
      • T406-Transport Network
      • T410-Transport Network
      • T411-Transport Network
      • T412-Transport Network
      • T413-Transport Network
      • T414-Transport Network
      • T415-Transport Network
      • T416-Transport Network
      • T420-Transport Network
      • T421-Transport Network
      • T422-Transport Network
      • T423-Transport Network
      • T424-Transport Network
      • T425-Transport Network
      • T426-Transport Network
      • T427-Transport Network
      • T430-Transport Network
      • T431-Transport Network
      • T432-Transport Network
      • T433-Transport Network
      • T434-Transport Network
      • T440-Transport Network
      • T442-Transport Network
      • T443-Transport Network
      • T450-Transport Network
    • +T500 Stormwater
      • T501-Stormwater
      • T502-Stormwater
      • T503-Stormwater
      • T504-Stormwater
      • T505-Stormwater
      • T506-Stormwater
      • T507-Stormwater
      • T514-Stormwater
      • T520-Stormwater
      • T521-Stormwater
      • T523-Stormwater
      • T524-Stormwater
      • T525-Stormwater
      • T530-Stormwater
      • T531-Stormwater
      • T532-Stormwater
      • T533-Stormwater
      • T534-Stormwater
      • T535-Stormwater
      • T536-Stormwater
      • T537-Stormwater
      • T538-Stormwater
      • T539-Stormwater
      • T540-Stormwater
      • T541-Stormwater
      • T542-Stormwater
      • T543-Stormwater
      • T550-Stormwater
      • T551-Stormwater
      • T552-Stormwater
      • T553-Stormwater
      • T554-Stormwater
    • +T600 Wastewater
      • T601-Wastewater
      • T602-Wastewater
      • T603-Wastewater
      • T604-Wastewater
      • T605-Wastewater
      • T606-Wastewater
      • T607-Wastewater
      • T608-Wastewater
      • T609-Wastewater
      • T610-Wastewater
      • T611-Wastewater
      • T612-Wastewater
      • T613-Wastewater
      • T614-Wastewater
      • T620-Wastewater
      • T621-Wastewater
      • T630-Wastewater
      • T631-Wastewater
      • T632-Wastewater
      • T633-Wastewater
      • T634-Wastewater
      • T637-Wastewater
      • T638-Wastewater
      • T639-Wastewater
      • T640-Wastewater
      • T641-Wastewater
      • T642-Wastewater
      • T643-Wastewater
      • T651-Wastewater
      • T652-Wastewater
      • T653-Wastewater
      • T654-Wastewater
      • T660-Wastewater
      • T661-Wastewater
      • T662-Wastewater
      • T663-Wastewater
      • T664-Wastewater
      • T665-Wastewater
      • T666-Wastewater
      • T667-Wastewater
      • T668-Wastewater
      • T669-Wastewater
      • T670-Wastewater
      • T671-Wastewater
      • T672-Wastewater
      • T673-Wastewater
      • T674-Wastewater
      • T675-Wastewater
      • T676-Wastewater
      • T677-Wastewater
      • T678-Wastewater
      • T679-Wastewater
      • T680-Wastewater
      • T681-Wastewater
      • T682-Wastewater
      • T683-Wastewater
    • +T700 Water Supply
      • T700-Water Supply
      • T701-Water Supply
      • T705-Water Supply
      • T706-Water Supply
      • T707-Water Supply
      • T708-Water Supply
      • T709-Water Supply
      • T710-Water Supply
      • T713-Water Supply
      • T714-Water Supply
      • T715-Water Supply
      • T716-Water Supply
      • T717-Water Supply
      • T718-Water Supply
      • T719-Water Supply
      • T720-Water Supply
      • T721-Water Supply
      • T722-Water Supply
      • T723-Water Supply
      • T724-Water Supply
      • T727-Water Supply
      • T728-Water Supply
      • T729-Water Supply
      • T730-Water Supply
      • T731-Water Supply
      • T732-Water Supply
      • T733-Water Supply
      • T734-Water Supply
      • T735-Water Supply
      • T736-Water Supply
      • T737-Water Supply
      • T738-Water Supply
      • T739-Water Supply
      • T740-Water Supply
      • T741-Water Supply
      • T742-Water Supply
      • T743-Water Supply
      • T744-Water Supply
      • T751-Water Supply
      • T753-Water Supply
      • T754-Water Supply
    • +T800 Public Lighting
      • T801-Public-Lighting
    • +AB As-Built Drawings
      • AB-01-As-Built Drawings
      • AB-02-As-Built Drawings
      • AB-03-As-Built Drawings
      • AB-04-As-Built Drawings
      • AB-100-As-Built Drawings
      • AB-200-As-Built Drawings
      • AB-400-As-Built Drawings
      • AB-500-As-Built Drawings
      • AB-600-As-Built Drawings
      • AB-700-As-Built Drawings
      • AB-800-As-Built Drawings
  • Approved Materials
  • +Construction Standards
    • +CS-1 General
      • CS-1_0 General Provisions
      • CS-1_1 Minimum Requirements
      • CS-1_2 Notifiable Works
      • CS-1_3 Road Zone Occupancy
      • CS-1_4 Health & Safety
      • CS-1_5 Confined Spaces
      • CS-1_6 Public Protection
      • CS-1_7 Culture and Heritage
      • CS-1_8 Environmental or Property Damaged
      • CS-1_9 Pollution
      • CS-1_10 Existing Utility Services
      • CS-1_11 Protection of Trees or Other Features
      • CS-1_12 Dust Control
      • CS-1_13 Nuisance
      • CS-1_14 Emergency
      • CS-1_15 Alternative Construction Methods
      • CS-1_16 Setting Out
      • CS-1_17 Inspection and Testing
      • CS-1_18 As-Built Information
    • +CS-2 Site Clearance
      • CS-2_0 Site Clearance
      • CS-2_1 Clearing and Removal of Vegetation and Rub
      • CS-2_2 Burning
    • +CS-3 Earthworks
      • CS-3_0 Earthworks
      • CS-3_1 Supervision
      • CS-3_2 Earthworks Management Plan
      • CS-3_3 Drainage Control
      • CS_3_4 Erosion & Sediment Control
      • CS-3_5 Protection & Maintenance of Works
      • CS-3_6 Modification to Control Systems
      • CS-3_7 Tolerances
      • CS-3_8 Inspections and Approvals
      • CS-3_9 Haul Roads
      • CS-3_10 Temporary Stockpiles
    • +CS-4 Excavation
      • CS_4_0 Excavation
      • CS-4_1 Stripping
      • CS-4_2 Removal of Topsoil
      • CS-4_3 Excavation Management
      • CS-4_4 Over Excavation
      • CS-4_5 Cut to Waste
      • CS-4_6 Cut to Fill
      • CS-4_7 Slips
      • CS-4_8 General Undercutting
      • CS-4_9 Protection of Subgrade
      • CS-4_10 Undercut for Shear Keys, Embankments and F
    • +CS-5 Excavation in Trench
      • CS-5_0 Excavation in Trench
      • CS-5_1 Over Excavation
      • CS-5_2 Trench Protection
      • CS-5_3 Groundwater
    • +CS-6 Fill
      • CS-6_0 Fill
      • CS-6_1 Conditioning and Spreading of Fill
      • CS-6_2 Placement of Shear Key and Embankment Under
      • CS-6_3 Compaction
      • CS-6_4 Compaction Trials
      • CS-6_5 Compaction Standards and Testing
      • CS-6_6 Shaping
      • CS-6_7 Topsoil Respreading
    • +CS-7 Bedding & Backfill
      • CS-7_0 Bedding and Backfill
      • CS-7_1 Backfill Material
      • CS-7_2 Compaction
    • +CS-8 Subsoil Drainage for Earthworks & Roads
      • CS-8_0 Subsoil Drainage for Earthworks and Roads
    • +CS-9 Pipework
      • CS-9_0 Pipework
      • CS-9_1 Jointing
      • CS-9_2 Laterals and End Caps
      • CS-9_3 Service Connections
      • CS-9_4 Tolerances
      • CS-9_5 Identification and Marking of Pipelines
      • CS-9_6 Cleaning and Disinfection of Watermains
      • CS-9_7 Connection to an Existing Network
    • +CS-10 Pipe Fittings
      • CS-10_0 Pipe Fittings
      • CS-10_1 Fire Hydrants
      • CS-10_2 Valves
      • CS-10_3 Anchor and Thrust Blocks
    • +CS-11 Manholes & Rodding Eyes
      • CS-11_0 Manholes and Rodding Eyes
      • CS-11_1 Invert Levels
      • CS-11_2 Channels and Benching
      • CS-11_3 Flexible Joints
      • CS-11_4 Sealing of Manholes
      • CS-11_5 Completion of Manholes
      • CS-11_6 Drop Connection
      • CS-11_7 Access Steps
      • CS-11_8 Rodding Eyes
    • +CS-12 Sumps
      • CS-12_0 Sumps
    • +CS-13 Trenchless Technology
      • CS-13_0 Trenchless Technology
      • CS-13_1 Location of Existing Services
      • CS-13_2 Alignment
      • CS-13_3 Directional Drilling
      • CS-13_4 Pipe Thrusting
      • CS-13_5 Guided Boring/Auger Boring
      • CS-13_6 Pipe Bursting
      • CS-13_7 Pipe Splitting
      • CS-13_8 Tolerances
      • CS-13_9 Damage
    • +CS-14 Road Ripping
      • CS-14_0 Road Ripping
      • CS-14_1 Ripping To Allow Placement of Additional B
      • CS-14_2 Use of Ripped Material
      • CS-14_3 Placing, Shaping and Compacting of Reused
      • CS-14_4 Asphalt Patch Surface
    • +CS-15 Road Pavement Layers
      • CS-15_0 Road Pavement Layers
      • CS-15_1 Subgrade Layer
      • CS-15_2 Sub-Base Layer
      • CS-15_3 Basecourse Layer
      • CS-15_4 Cement Stabiliation of Pavement Layers
    • +CS-16 Kerb & Channel
      • CS-16_0 Kerb and Channel
      • CS-16_1 Kerb and Channel Removal
      • CS-16_2 Saw Cutting
      • CS-16_3 Excavation to Pavement Depth
      • CS-16_4 Subgrade Preparation
      • CS-16_5 Kerb and Channel Foundation
      • CS-16_6 Kerb and Channel Placing
      • CS-16_7 Carriageway Reinstatement
    • +CS-17 Concrete Work
      • CS-17_0 Concrete Work
      • CS-17_1 Formwork
      • CS-17_2 Concrete Mix and Proportions
      • CS-17_3 Placing Concrete
      • CS-17_4 Reinforcement
      • CS-17_5 Curing Of Concrete
      • CS-17_6 Machine Laid Kerb and Channel
      • CS-17_7 Finished Work
      • CS-17_8 Contraction/Expansion Joints
      • CS-17_9 Backfilling Against Concrete Work
      • CS-17_10 Surface Finish (Footpath and Vehicle Cros
    • +CS-18 Carriageway Surfacing
      • CS-18_0 Carriageway Surfacing
      • CS-18_1 Two Coat Seal (First Coat with Wet locking
      • CS-18_2 Two Coat Seal and Open Graded Porous Aspha
      • CS-18_3 Single Coat Membrane Seal and Asphaltic Co
      • CS-18_4 Requirements after Chip Sealing
      • CS-18_5 Removal of Surplus Chip
      • CS-18_6 Protection and Repairs of the Seal Coat
    • +CS-19 Roadmarking
      • CS-19_0 Roadmarking
    • +CS-20 Berm Features
      • CS-20_0 Berm Features
      • CS-20_1 Alignments, Line and Levels
      • CS-20_2 Break-out, Removal and Disposal of Existin
      • CS-20_3 Excavation to Footpath Depth
      • CS-20_4 Subgrade Preperation
      • CS-20_5 Pavement-Course for Berm Features
      • CS-20_6 Concrete Footpaths and Vehicle Crossings
      • CS-20_7 Contraction/Expansion Joints
      • CS-20_8 Asphalt Surfacing
      • CS-20_9 Asphalt Overlay
      • CS-20_10 Block Paving
      • CS-20_11 Edge Restraints
      • CS-20_12 Timber Edging for Seal, Asphalt, Paving,
    • +CS-21 Street Structures
      • CS-21_0 Street Structures
      • CS-21_1 Road Signs
      • CS-21_2 Safety Barriers
      • CS-21_3 Bollards and Removable Bollards
      • CS-21_4 Pedestrian Barrier Rails and Handrails
      • CS-21_5 Cycle Barriers and Racks
      • CS-21_6 Public Lighting
    • +CS-22 Road Maintenance
      • CS-22_0 Road Maintenance
      • CS-22_1 Pot Holes
      • CS-22_2 Dig Outs
      • CS-22_3 Crack Sealing
      • CS-22_4 Surface Defects
      • CS-22_5 Edge Breaks
      • CS-22_6 Unsealed Shoulders
      • CS-22_7 Surface Detritus
      • CS-22_8 Edge Marker Posts
      • CS-22_9 Guardrails and Median Barriers
      • CS-22_10 Traffic Signs, Chevrons, Markers and Sigh
      • CS-22_11 Vegetation
    • +CS-23 Grassing & Turfing
      • CS-23_0 Grassing and Turfing
      • CS-23_1 Preparation for Sowing or Turfing
      • CS-23_2 Topsoil Spreading/Re-spreading
      • CS-23_3 Fertiliser
      • CS-23_4 Sowing2
      • CS-23_5 Establishment of Sown Areas
      • CS-23_6 Weeds
      • CS-23_7 Defects Liability Period
    • +CS-24 Vegetation Planting & Gardens
      • CS-24_0 Vegetation Planting and Gardens
      • CS-24_1 Soil and Fertility
      • CS-24_2 Mulch
      • CS-24_3 Juvenile Tree Planting
      • CS-24_4 Pruning
    • +CS-25 Reinstatement
      • CS-25_0 Reinstatement
      • CS-25_1 Removed Items
  • +Inspection & Testing Requirements
    • +IT-1 General Provision
      • IT-1_1 General
      • IT-1_2 Minimum Requirements
      • IT-1_3 Applying for Inspections
      • IT-1_4 Asset Inspection/Testing Requirements
      • IT-1_5 Random Inspections
      • IT-1_6 Final Inspection
      • IT-1_7 Liability
      • +IT-1 Appendix A - Inspection and Testing Summary
        • IT-1 Appendix A-1 Inspection and Testing Summary
      • +IT-1 Appendix B-Company Requirements for Soils, Ea
        • IT-1 Appendix B_1 Minimum Requirements
      • +IT-1 Appendix C - Closed Circuit Television Inspec
        • IT-1 Appendix C_1 General
        • IT-1 Appendix C_2 Engaging a CCTV Provider
        • IT-1 Appendix C_3 Responsibilities of all Parties
        • IT-1 Appendix C_4 Cleaning
        • IT-1 Appendix C_5 Water Flow in Pipe
        • IT-1 Appendix C_6 Defect Codes
        • IT-1 Appendix C_7 Failure Triggers
        • IT-1 Appendix C_8 Failures
        • IT-1 Appendix C_9 Major Defects Requiring Immediat
        • IT-1 Appendix C_10 Deliverables
    • +IT-2 Streetscape
      • IT-2_1 Inspection
      • IT-2_2 Testing
    • +IT-3 Reserves
      • IT-3_1 Inspection
      • IT-3_2 Testing
    • +IT-4 Transportation Network
      • IT-4_1 Inspection
      • IT-4_2 Testing
      • +IT_4 Appendix-Company Requirements for Pavement Te
        • IT-4-Appendix A_1 General
      • IS4_1 Inspection Sheet Vehicle Crossing
      • IS4_2 Inspection Sheet Pre-Seal
    • +IT-5 Stormwater
      • IT-5_1 Inspection
      • IT-5_2 Testing
      • IS5_1 Inspection Sheet Stormwater Manhole and Pipe
      • 1S5_2 Inspection Sheet Sump
    • +IT-6 Wastewater
      • IT-6_1 Inspection
      • IT-6_2 Testing
      • IS6_1 Wastewater Manhole and Pipeline
      • TS6_1 Wastewater Low Pressure Air Test
      • TS6_2 Wastewater High Pressure Air Test
      • TS6_3 Wastewater Rising Main Pressure Test
      • TS6_4 Manhole Infiltration Test
    • +IT-7 Water Supply
      • IT-7_1 Inspection
      • IT-7_2 Testing
      • IS7_1 Inspection Sheet-Hydrant
      • IS7_2 Inspection Sheet - Valve
      • IS7_3 Inspection Sheet - Water Connection
      • TS7_2 Disinfection Mixture
    • +IT-8 Public Lighting
      • IT-8_1 Inspection
      • IT-8_2 Testing
    • +IT-9 Network Utilities
      • IT-9_1 Inspection
      • IT-9_2 Testing
  • Facebook
  • Twitter
  • Linkedin
Tauranga City Council IDC  
Infrastructure Development Code

QA-7 Bonds and Maintenance Fee

  Quality Assurance Information Requirements   >   QA-7 Bonds and Maintenance Fee

PreviousNext

In this section

QA-7.1 General

QA-7.2 Landscaping: Maintenance Works and Incomplete Works Bonds

QA-7.3 Other Bonds

QA-7.4 Bonded Works

QA-7.5 Release of Bond

QA-7.6 Non Performance

QA-7.7 Landscaping: Maintenance Works Handover Fee

Copyright 2018 Tauranga City Council | Terms Of Use