Infrastructure Development Code

PreviousNext

Areas of expected undercut are shown on the Contract Drawings and the Engineer may instruct additional or reduced areas of undercut as the works progress.
 
The work shall be carried out separately to the cut-to-fill operations and shall be planned in conjunction with stream diversions, culvert construction and other associated works as necessary. Sides of excavations shall be at slope angles compatible with slope heights to ensure stability


Definitions in this section

Engineer