Infrastructure Development Code

PreviousNext

The Contractor shall direct operations to avoid excavating beyond the designated profiles except where specifically instructed. Any excavation beyond these profiles without the instruction of the Engineer shall be made good to the approval of the Engineer. This may include additional subsoil drainage and appropriately placed, compacted and structurally keyed fill of equal quality to the excavated profile.


Definitions in this Section

Contractor

Engineer