Infrastructure Development Code

PreviousNext

Where, in the opinion of the Engineer, the subgrade is not suitable for bedding it shall be excavated to the depth directed by the Engineer, backfilled with free draining granular material and compacted as described in CS-6.3 Compaction.


Definitions in the section

Engineer