Infrastructure Development Code

PreviousNext

The finished shape of the earthworks shall be as shown on the Approved Drawings, or as instructed by the Engineer. The earthworks profiles shall generally be trimmed to match and blend with adjacent sections of earthworks and/or undisturbed existing ground.


Definitions in this section

Approved drawings

Engineer

Ground