Infrastructure Development Code

PreviousNext

Except as specified below, selected material excavated from the trench shall be used for backfilling trenches.

  1.  In roads and paved areas where material excavated from the trench cannot meet the compaction standards in CS-7.2 Compaction, imported granular material shall be used.
  2. Surplus and unsuitable material from the excavation shall be disposed of at a consented landfill.

Definitions in this section

Road