Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

CS-1.12 Dust Control

PreviousNext

A Dust Management Plan shall be submitted for approval before beginning works. This plan shall include information on the site construction methodology, dust suppressant application. A 24-hour contact person and phone number shall also be included in the plan.

Earthmoving shall be carried out with all haul roads and cut/fill areas maintained so dust is not raised near, or blown over, the work area and adjacent properties. The site shall be kept watered as necessary to meet this requirement until covered by a stabilising method as required by the Engineer, e.g. mulch, established grass.

A Dust Management Plan shall be submitted for approval before beginning works. This plan shall include information on the site construction methodology, dust suppressant application. A 24-hour contact person and phone number shall also be included in the plan.

When restrictions of Council supplied water apply, the Contractor shall use an alternative water supply, the details of which shall be detailed within either the Bay of Plenty Regional Council Resource Consent or Council requirements. Should this alternative supply limit the area of controllable earthworks to less than that currently open, the Contractor shall ensure that all areas in excess of the controllable area are suitably stabilised and only work within an area that can be suitably controlled.

If at any time the Engineer believes that dust control is not being maintained on site as approved under the plan, the Engineer may order a stop to construction works until dust control is properly managed. Any stoppage so ordered will not be grounds for an extension to the Contract period.


Definitions in this section

Bay of plenty regional council      

Contractor

Council

Engineer

Person

Resource consent

Road

 

Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand  |  Terms of use

Back To Top