Contraction/Expansion joints shall be formed or cut at vehicular crossing/footpath edges and along the path at a maximum spacing of 5.0m. All crack control lines shall be not less than 25mm deep.
Definitions in this section
Footpath
Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand | Terms of use