Infrastructure Development Code

PreviousNext

Contraction/Expansion joints shall be formed or cut at vehicular crossing/footpath edges and along the path at a maximum spacing of 5.0m. All crack control lines shall be not less than 25mm deep.


Definitions in this section

Footpath