To minimise the potential for slope instability the Contractor shall place stockpiles only in locations approved by the Engineer. All stockpiles shall be constructed to be free draining with overall grades and profiles that avoid ponding and minimise erosion and have the surface compacted to prevent surface erosion.
Definitions in this Section
Contractor
Engineer
Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand | Terms of use