Any haul road/s proposed by the Contractor shall be subject to the approval of the Engineer. The construction and use of haul roads shall not compromise the construction and future integrity of the permanent works.
In general, haul roads in cut areas shall be left at 1.5m, or greater, above finished design levels to minimise damage to the permanent works.
Definitions in this Section
Contractor
Engineer
Design
Road