The Contractor shall programme their work so the subgrade is protected from the effects of weather and construction plant (or similar) at all times before any undercut treatment and/or placing of road pavement. If the surface of the subgrade is damaged or deteriorates before subgrade undercut treatment and/or pavement installation then the affected area shall be scarified, reshaped, replaced, recompacted or otherwise treated and retested until the requirements for the subgrade are obtained to the approval of the Engineer.