Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

CS-6.1 Conditioning and Spreading of Fill

PreviousNext

Before fill is placed, the Contractor shall notify the Engineer that the fill foundation has been stripped, drained, (including subsoil drains) and prepared as per the Contract Drawings and documents and is ready for the Engineer’s inspection. 

Before compaction, fill materials shall be spread uniformly in horizontal layers and if necessary, be conditioned to an appropriate moisture content by aeration and drying or wetting (as the case may be), and/or by blending and mixing "wet" and "dry" materials. If soil is to be dried, the Contractor shall disc it and allow it to dry uniformly to its full depth. If the soil is to be wetted, this shall be done with sprinklers capable of ensuring uniform and controlled distribution of water in conjunction with blading and disking. In all cases the fill shall be mixed and conditioned thoroughly so that immediately before compaction the material type and its moisture content is reasonably uniform within one area and as close as practical of optimum moisture content. Before compaction the layers shall be less than 250mm loose thickness. All fragments within the loose layer shall be less than 100mm maximum dimension.

No new fill shall be placed over previously compacted material until the construction methodology to be utilised by the contractor has been reviewed and observed by the Engineer and Geo-Professional.  Once the construction methodology has been observed, the Engineer or the Geo-Professional shall confirm whether they are satisfied that continued placement of earth fill will ensure that all earthworks will meet the required compaction standards and testing methodology.

Effective drainage shall be maintained during filling operations to minimise any deterioration of material exposed in excavation areas and in the uppermost fill layers. 

Special care shall be taken to avoid hollows which could pond water. All fill surfaces shall be protected when rain is imminent to minimise erosion and protect the fill from strength loss of the fill due to an increase in moisture content.

Where fill is to be placed against sloping surfaces steeper than 1v:2h, the sloping surface shall be excavated ("benched") such that horizontal benches no greater than 1.0m height intervals are formed.

Filling shall be carried out so that no area of fill is ever more than 0.5m higher than any other adjacent area of filling unless approved by the Engineer.

In order to ensure adequate compaction of the materials forming the final fill surface profile, all fill batter faces shall be overfilled as necessary and carefully trimmed back to the required design profile.