Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

CS-6.3 Compaction

PreviousNext

The Contractor shall comply with all requirements of compaction as specified in the Contract Documents or by the Geo Professional.

Unless instructed by the Geo-Professional the following shall apply:

  1. The Contractor shall employ sufficient dedicated compaction plant to achieve the specified compaction. Equipment used in transportation and spreading will not be accepted as compaction plant. Compaction plant shall cover the entire area of each layer of fill and give each layer a uniform degree of compaction. The combined operations of spreading and compacting shall be undertaken using systematic and properly managed procedures approved by the Engineer to ensure that each loose layer receives the required passes of the roller or other approved compaction equipment before further loose material is spread.
  2. When soil is to be dried the Contractor shall disc the soil and allow it to dry uniformly to its full depth. When the soil is to be wetted, this shall be done with sprinkler ensuring uniform and controlled distribution of water in conjunction with blading and disking. Steps shall be taken to ensure that cohesive fills are at the correct water content and not over-compacted to such an extent that excessive weaving of the fill occurs.
  3. Notwithstanding the Geo-Professional's specified testing requirements, he/she may also carry out spot tests of compaction at any time. The Contractor shall stop or divert machinery as required to allow the tests to be carried out. Where tests indicate that the specified standard of compaction has not been achieved, corrective action shall be taken to bring the fill to the standard required by the Geo-Professional. This may mean the affected fill must be reworked by scarifying, conditioning and recompacting or alternatively it may mean removing and replacing the fill with complying material is required.
  4. Competent and well-experienced site supervisors shall be provided by the Contractor to control procedures and shall carry out their duties primarily at the fill platform and not by delegation.

Definitions in this section

Contractor

Contract documents

Engineer

Geo-professional