Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

CS-6.5 Compaction Standards and Testing

PreviousNext

The Contractor shall comply with all requirements of compaction standards and testing as specified in the Contract Documents or by the Geo-Professional.

The tests and testing frequency described in the Contract Documents or by the Geo-Professional shall be used to confirm that the placed fill materials meet the required Contract standards, design criteria and parameter values. At any time either before or during the course of construction, the Geo-Professional may direct modifications to the compaction standards, frequencies and test methods defined in the Contract Documents with the objective of ensuring that the design criteria and objectives for particular materials and conditions are achieved.

The defined compaction and test requirements shall relate to the materials expected to be used. Should alternative materials be proposed by the Contractor then he/she shall also propose quality control testing methods and procedures to demonstrate to the Geo-Professional that the necessary design criteria can be achieved.

The tests to confirm Contract requirements shall be undertaken using the specified methods. However, the Geo-Professional may approve more approximate and rapid methods on a day-to-day basis for preliminary assessment. Where an adequate correlation is established between the rapid and fully specified methods, the Geo-Professional may rely on the results of the rapid methods. Where there are discrepancies between the results obtained by rapid and fully specified methods the Geo-Professional shall decide which tests apply. Results obtained by rapid methods shall not be used for final acceptance purposes unless approved by the Geo-Professional.

The locations and levels of all in situ tests shall be recorded within tolerances of 0.2m horizontally and 0.1m vertically.

All testing is to be carried out using an IANZ accredited testing organisation DS-1.13 Companies for Soils and Earthworks Testing, with all equipment calibrated to relevant standards at the required frequency. The proposed testing organisation(s) may be contracted by either the Contractor or the Geo-Professional prior to commencement of work. The Geo-Professional retains the right to request an alternative and/or independent supply agreement for geotechnical testing services. The Contractor is expected to conform to all requirements to allow for the testing laboratory to undertake any tests and locate testing sites.

The Geo-Professional will instruct as to the frequency of testing required.

CS-6.5.1 Fill Test Methods

The Contractor shall comply with all requirements of compaction standards and testing as specified within the Contract Documents or by the Geo-Professional.

Should alternative materials/testing be proposed by the Contractor then he/she shall also propose appropriate quality control testing methods and procedures in order to demonstrate to the Geo-Professional that the design criteria can be achieved.

Such material/testing may not be used unless approved by the Geo-Professional.


Definitions in this section

Contractor

Contract documents

Design

Geo-professional