Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

CS-9.1 Jointing

PreviousNext

  1. All joints shall be installed in accordance with the manufacturer's requirements.
  2. Unless otherwise instructed by the Engineer or included in the standard drawings, all weld beads shall be removed for Wastewater pipes only.

CS-9.1.1 Polyethylene (PE) Jointing

Butt and electrofusion welded jointing shall be carried out only by experienced certified PE welders. The certifying organisation shall be acceptable to the Council. In addition welders may be required to carry out satisfactory test welds for each joint type and to stamp the welder's number on each joint.

  1. Butt welds shall be at least 90% of the tensile strength of the parent pipe material when tested in accordance with ISO 13953. All internal weld beads shall be removed. This shall be carried out in an approved manner, to be smooth and flush with the pipe inner surface, without compromising the strength of the pipe joint.
  2. For electrofusion welding:
    1. Couplers shall be of the same rating as the pipe or superior. A manufacturer approved scraping tool shall be used to uniformly scrape the pipe ends all round the pipe barrel. Hand scraping is not permitted.
    2. The welder shall mark witness marks on each end of the pipes to be jointed. The distance from the end of the pipe to the witness mark shall be half the length of the coupler. The pipe insertion to the coupler shall be achieved by manufacturer approved pulling and clamping equipment.
    3. Bending the pipes up for insertion into the coupler and then pushing back is not permitted.
    4. Once the jointing is complete, the witness marks shall be only just visible.

Definitions in this section

Council

Engineer

Wastewater