Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

CS-9.5 Identification and Marking of Pipelines

PreviousNext

  1. Where principal or trunk main are laid "across country" or not parallel to boundary lines, the location of the water main is to be marked by a H4 treated timber post measuring 50mm x 150mm or a standard concrete valve/hydrant post without the H or V. All posts shall be painted white. The marker post shall be placed above the pipe at no more than 100m intervals, at changes of direction or where the pipe crossed fence lines.
  2. All open cut installations shall include warning / detection tape to be laid in the trench 300mm above the top of the pipe. This to be laid after the second layer of bedding has been compacted. Refer to AM-5 Stormwater Approved Materials, AM-6 Wastewater Approved Materials and AM-7 Water Supply Approved Materials for tape type.
  3. All non metallic pipes installed by trenchless technology shall have a tracer wire strapped to the pipe and fixed thereto by using a minimum of 2 complete wraps of 50mm wide heavy duty adhesive tape at a maximum of 3.0m intervals. The wire shall have some slack to allow for bends in laying and for future installation of tapping saddles, which shall be placed under the tracing wire. Refer to: AM-5 Stormwater Approved Materials, AM-6 Wastewater Approved Materials and AM-7 Water Supply Approved materials for tracer wire type.
  4. Wire traces shall be continuous between valves and hydrants to allow a continuous electrical current and shall be anchored to that fitting below the box lid to enable ease of connection. The tracer wire shall be long enough to extend 600 mm minimum above ground level when uncoiled (refer to T713 & T716). The excess length shall be neatly coiled in the valve or hydrant box.
  5. The tracer wire shall be tested for continuity between surface boxes using an electronically generated tone and detector probe or alternative approved method. The ends of the wire are to be sealed in a water tight manner to prevent the wire from corroding. 