Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

DS-10.2 Landform Development 

PreviousNext

Designs shall ensure that both natural and modified landforms meet the following criteria:

  1. Every parcel of land shall possess a nominated building platform suitable for the erection thereon of buildings / structures appropriate to its zoning.
  2. When applying for Resource Consent, each application shall provide Council with a Development Evaluation Report.
  3. Acceptable engineering and industry methods and standards shall be used when assessing, designing, constructing and certifying nominated building platforms and development works.
  4. Designs shall minimise, isolate or eliminate health and safety hazards during both its construction and its use. All landform or engineering designs shall include a Safety in Design section of the design report that demostrates health and safety hazards can be minimised, isolated or eliminated during construction and operation.

Suggest also referencing the following safety in design standard:

“AS/NZS ISO 31000:2009 – Risk Management – Principles and Guidelines"

  1. Design shall minimise, isolate or eliminate health and safety hazards during both its construction and its use.
  2. Design shall minimise, isolate or eliminate any adverse ecological and environmental effects.
  3. Development works are required to ensure the construction of safe building platforms and that any modified landforms are also safe. Conditions of consent will be imposed to ensure this occurs.
  4. The nominated building platform is deemed safe when certification has been received from either a Geo-Professional and / or a SQE Professional that the performance criteria DS-10.3 Performance Criteria have been met and that building consents for the nominated building platform can be issued without reference to s72 of the Building Act being required.
  5. When applying for final signoff (s224), each completed development shall provide Council with a Development Completion Report.

Definitions in this section

Building act

Building platform

Council

Design

Development completion report

Development evaluation report

Development works

Geo-professional

S224

SQE professional

 

Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand  |  Terms of use

Back To Top