All utilities shall be located, where possible, in the location/s shown on the Standard Drawings.
Where the standard location is not possible, a new location shall be approved between the Utility Operator and the Corridor Manager. Acceptance of this new location will be included in the approval of the Works Access Permit (WAP).
Definitions in this section
Corridor manager
Utility operator
Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand | Terms of use