Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

DS-2.5 Topsoil and Grassing

PreviousNext

The timing of grass sewing shall be considered when the grass type is selected as there are two types of grasses, warm season grasses i.e. Couch and Kikuyu and cold season grasses i.e. Rye and Fescue.

Warm Season grasses grow actively over summer and are far more tolerant of coastal conditions however can not be established from seed.

Cold season grasses do not tolerate extreme dry or hot temperature and grow actively over winter/cooler months and are easily established from seed.

With the exception of the New Zealand Browntop component, all seed shall be certified and less than 12 months old at the time of sowing. A ryegrass component to be certified as having greater than 80% live endophyte content. Seed that has deteriorated because of wetting, fertiliser-burning, etc shall not be used.

Seed mixture is to be either:

NZ Browntop - (50 kg/ha)

High endophyte Turf Rye - (200 kg/ha)

or a mix containing:

No less than 80% High Endophyte Turf Rye (200 kg/ha) with the balance 20% made up of NZ Browntop and/or NZ fescues

All new grass areas shall be built on a subgrade prepared to a California Bearing Ratio (CBR) of not less than 5 and no greater than 7. 

A 100mm (minimum) deep layer of clean, friable peat loam or sandy loam topsoil free of all perennial weeds, stones and rubbish shall be placed on the subgrade. 

Consistent watering is required to ensure adequate turf establishment. 

Other grassing techniques are subject to Council approval.

Refer to CS-23 Grassing and Turfing and AM-2 Streetscape for topsoil, grass and fertiliser mixes.


Definitions in this section