Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

DS-3 - Appendix A - Associated Standards

PreviousNext

In this section

DS-3 - Appendix A.1 General

DS-3 - Appendix A.1 General

The latest revision or operative version of the following standards shall be used in conjunction with the Infrastructure Development Code:

  1. Council documentation:
    1. City Plan.
    2. TCC Vegetation Management Strategy.
    3. TCC Urban Design Strategy.
    4. TCC Open Space Strategy.
    5. TCC Best Practice Guide for Open Space.
    6. TCC Integrated Transportation Strategy.
    7. TCC Track and Walkway – Development and Maintenance Manual.
    8. TCC Signs Policy and Manual.
    9. TCC Plant Pest Management Strategy.
    10. TCC Best Practice Guide to Neighbourhood Reserves.
    11. TCC Planting Guide - Street and Reserve Gardens.
    12. TCC Development Guide.
  2. New Zealand / Australian / British Standards:
    1. NZS 5828 Specifications for Playgrounds.
    2. NZS 3104:2003 Specification for Concrete Production.
  3. Other reference material:
    1. Resource Management Act.
    2. New Zealand Building Act.
    3. Health and Safety Work Act.
    4. New Zealand Historic Places Act.
    5. New Zealand Reserves Act.
    6. Modern Arboriculture by Alex Shigo. 
    7. The Sunset Pruning Handbook.
    8. New Zealand Playground Safety Manual.

Definitions in this section

City plan

Council

Infrastructure

TCC

Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand  |  Terms of use

Back To Top