Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

DS-7.4 Non Council Supply

PreviousNext

Where Council is not obligated to supply water, design proposals for private source and supply of potable water shall follow the requirements of the Health (Drinking Water) Amendment Act

  1. In these situations, the person or party supplying potable water to others becomes a Water Supplier. The Health (Drinking Water) Amendment Act requires Water Suppliers to:
    1. Register their supply.
    2. Monitor their water quality. Monitoring tests must be carried out by a recognised laboratory.
    3. Implement a water safety plan.
    4. Take all practicable steps to comply with the drinking-water standards.
    5. Ensure an adequate supply and take reasonable steps to protect the source.
  2. A person or party who supplies potable water by tanker rather than pipes is known as a Water Carrier. The Health (Drinking Water) Amendment Act requires Water Carriers to:
    1. Register their carrier business (see list),
    2. Renew their registration annually.

 
Designers shall provide details of the source, capacity and quality of the existing and proposed water supply to Council and any other organisation as required by the Act.

Where any lot is connected to Council’s water supply network and uses an alternative supply of water, for irrigation, residential supply or any other use, the connection to Councils water supply network shall be installed with backflow devices appropriate to the hazard rating and be maintained to prohibit cross contamination of the Council’s system.


Definitions in this section

Council

Design

Designer

Lot

Person

Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand  |  Terms of use