Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

DS-8 - Appendix E Lighting Column Evaluation Checklist 

PreviousNext

DS-8 - Appendix E.1   General

The following shall be utilised when assessing structural performance of lighting columns.

Lighting Column Evaluation Checklist

Aspect    

Result

1

Height and Outreach Length

Pass      ⃝      Fail      ⃝

2

Tilt Angle

Pass      ⃝      Fail      ⃝

3

Permanent Design Load

Pass      ⃝      Fail      ⃝

4

Wind Design Load

Pass      ⃝      Fail      ⃝

5

Structural Steel Thickness

Pass      ⃝      Fail      ⃝

6

Steel Properties

Pass      ⃝      Fail      ⃝

7

Deflections

Pass      ⃝      Fail      ⃝

8

Dynamic Response

Pass      ⃝      Fail      ⃝

9

Switchboard Door Cavity Opening

Pass      ⃝      Fail      ⃝

10

Protective coating

Pass      ⃝      Fail      ⃝

11

Base Section

Pass      ⃝      Fail      ⃝

12

Welding

Pass      ⃝      Fail      ⃝

13

Design Life

Pass      ⃝      Fail      ⃝

Identify any issues with the Column

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Recommend Column for Approved Column List

    Yes      ⃝       No      ⃝

Assessment Completed By:

Company Name:

 

Contact Name:                                                                               Position:

                                                               

Phone Number:                                                                         Email Address:

 

Signature:                                                                                 Date:

 

 

Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand  |  Terms of use