Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

IT-1.2 Minimum Requirements

PreviousNext

  1. As a minimum, Council will undertake formal inspections/tests as referenced within this section of the IDC.
  2. In some cases additional inspections/tests may be required. These additional inspections/tests will be outlined in the Development Works Approval or requested when unforeseen circumstances arise or to resolve a difference of opinion. These additional inspections/tests will be advised by Council where required.
  3. Council will not attend any formal inspections/tests where the work to be inspected/tested has not been pre-inspected/tested and confirmation provided to Council that the inspection/test is ready for formal inspection/test. Where work to be inspected/tested is not ready for inspection/testing or the equipment required for the inspection/testing is not on site then Council staff will leave the site and only return when the work is ready for inspection/testing. 
  4. Where Council arrives for a formal inspection/test and that inspection/test is deemed "not ready" to be undertaken, Council reserves the right to cancel the inspection/test and require it to be re-scheduled. 
  5. Council will charge associated costs to the Consent Holder for any inspection/test attended that is deemed not ready and for any re-testing/re-inspection where inspections/tests have previously been failed.
  6. The requirements for application for re-inspection/re-tests are the same as for the requirements for the initial inspection/test.

Where the Consent Holder's Representative fails to comply with these provisions, Council may not:

  1. Accept the assets for vesting.
  2. Allow the new infrastructure to be connected to the existing network.
  3. Issue the s224 for the subdivision.
  4. Issue building consents or code compliance certificates for any buildings proposing to connect to the infrastructure.

Definitions in this section

Asset

Consent holder

Consent holder's representative

Council

Development works approval

IDC

Infrastructure 

S224

Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand  |  Terms of use

Back To Top