- A final inspection and walkover with As-Built plans shall be undertaken once all works are deemed complete.
- The request for final inspection shall confirm that all physical works requiring inspection have been pre-inspected by the Certifying Engineer or Consent Holder's Representative, that all testing has been successfully completed and the site is ready for the final inspection by Council. This inspection is sometimes known as the pre-(s)224c inspection.