Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

IT-4.1 Inspection

PreviousNext

Refer to IT-1 General Provisions for the procedure for initiating inspection by Council Representatives.

IT-4.1.1 Formal Inspections

The following inspections shall be advised to and undertaken with Council’s Representatives:

  1. Sub-grade inspection. 

Acceptance of the subgrade and its test results by both the Engineer and Council’s Representative shall be confirmed prior to work commencing on the sub-base/basecourse construction activities.

  1. Sub-base inspection. 

Acceptance of the sub-base and its test results by both the Engineer and Council's Representative shall be confirmed prior to work commencing on the basecourse.

  1. Pre-seal inspection (completed carriageway basecourse). 

Acceptance of the basecourse and its test results by both the Engineer and Council’s Representative shall be confirmed prior to membrane sealing of the carriageway.

  1. Pre-surfacing inspection (after completion of seal membrane). 

Acceptance of the membrane seal, any relevant test results and any other inspection and testing requirements for other assets located in the carriageway by both the Engineer and Council’s Representative shall be confirmed prior to final surfacing.

  1. Pre-concrete pour inspection for footpaths. 

Acceptance of the formwork and footpath sub-base by both the Engineer and Council’s Representative shall be confirmed prior concrete pour.

  1. Other inspections may be required that are not listed above. These will be advised by Council where applicable.
  2. A complete inspection of all assets prior to s224(c) application is required as specified in IT-1 General Provisions.

IT-4.1.2 Random Inspections

Council will undertake random inspections of all site features throughout the construction period to ensure good industry practice and compliance with all requirements for the infrastructure development are being followed.


Definitions in this section

Asset

Council

Engineer

Footpath

Infrastructure

S224