  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

IT-5.2 Testing

PreviousNext

Testing of stormwater pipelines shall include:

  1. IT-5.2.1 Testing of Butt Welds in Polyethylene Pipes
  2. IT-5.2.2 Testing of Electrofusion Welds in Polyethylene Pipes​

IT-5.2.1 Testing of Butt Welds in Polyethylene Pipes

Testing shall be carried out in accordance with ISO 13953:2001. The number of specimens per weld tested shall be in accordance with this standard.

In addition to the results provided in terms of the standard, a graph of load vs tensile extension shall be provided to assist with the interpretation of ductile and brittle failure. The results shall be submitted to Council. Test pieces shall be retained by the Contractor until the issue of the Defects Liability Certificate and shall be made available to the Engineer on request.

Before welding of the main pipe string commences, two proof welds shall be carried out and tested. If at any time during the welding of the pipe string either the welder or the welding machine is changed two further proof welds shall be carried out and tested. On the main pipe string 5% of welds carried out shall be tested, with a minimum of one weld.

If a weld has failed the Contractor shall expose the immediately preceding weld which shall be tested as described above.

IT-5.2.2 Testing of Electrofusion Welds in Polyethylene Pipes

Testing of electrofusion welds shall be carried out in accordance with ISO 13954:1997. The minimum number of specimens per weld shall be three.

Before welding of the main pipe string commences, two proof welds shall be carried out and tested. If at any time during the welding of the pipe string either the welder or the welding machine is changed two further proof welds shall be carried out and tested. On the main pipe string 5% of welds carried out shall be tested, with a minimum of one weld.

If a weld has failed the Contractor shall expose the immediately preceding weld, which shall be tested as described above.


Definitions in this section

Contractor

Council

Engineer

Stormwater