Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

QA-3 Appendix A Type 2 Development Works Approval Report Summary

PreviousNext

QA-3 - Appendix A.1  Summary List of DWA Chapters

The following summarises the chapters required to produce a Type 2 Development Works Approval report.
Volume 1:
Information regarding the following shall be submitted for Subdivisions, Unit Title Developments or Large Scale Land Use Developments:

Volume 1:
1 - General Report Information.
Project Introduction
Appendix A - Consents.
Appendix B - Producer Statement: Design. 
Appendix C - Certificate: Indemnity Insurance. 
Appendix D - Project Summary Information. 
Appendix E - Development Works Approval Fee Calculation
2 - Development Information: Natural Hazards and Earthworks.
Appendix F - Supporting Information: Natural Hazards and Earthworks.
3 - Development Information: Streetscape.
Appendix G - Supporting Information: Streetscape 
4 - Development Information: Reserves.                    
Appendix H - Supporting Information: Reserves.
5 - Development Information: Transportation.                     
Appendix I - Supporting Information: Transportation.     
6 - Development Information: Stormwater.                     
Appendix J - Supporting Information: Stormwater.
7 - Development Information: Wastewater.                
Appendix K - Supporting Information: Wastewater.
8 - Development Information: Water Supply.                
Appendix L - Supporting Information: Water Supply.
9 - Development Information: Public Lighting.                
Appendix M - Supporting Information: Public Lighting.
10 - Development Information: Network Utilities.            
Appendix N - Supporting Information: Network Utilities.    
10 - Further Information.        
Appendix O - Supporting Information: Further Information.

Volume 2:
1 – List of Drawings.
2 – Drawings: Natural Hazards and Earthworks.

Checklist
3 – Drawings: Transportation/Streetscape/ Public Lighting. (where located within Road Zone).
Checklist
4 – Drawings: Reserves/Public Lighting (where located within Reserve).
Checklist
5 – Drawings: Stormwater.
Checklist
6 – Drawings: Wastewater.
Checklist
7 – Drawings: Water Supply.
Checklist
8 – Drawings: Network Utilities.
Checklist
9 – Drawings: Combined Services Plan.