Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

QA-6.4 As-built Information Types

PreviousNext

Depending on the size and type of works, As-Built information shall be submitted as either:

  1. QA-6.4.1 Hardcopy: Measurement Produced.
  2. QA-6.4.2 Electronic: Survey and Software Produced.

QA-6.4.1  Hardcopy: Measurement Produced

The following shall apply:

  1. This method is applicable to: 
    1. Subdivision Development Works Type 1 Asset Vesting Process (i.e. up to 3 independent dwelling units): Where only standard service connections are to be vested.
    2. Council Maintenance Works: Where only standard service connections are constructed.
    3. Service Connection Works both via Building Consent and non-Building Consent approval processes.
  2. Typically this would only be accepted for infrastructure where a Reduced Level (RL) is not required, the infrastructure is of minor risk and there are only a small number of assets. 
  3. This information can be tidily hand drawn with offsets to known boundaries given as locators.
  4. Asset information and attributes shall be provided as detailed in Councils guideline Electronic As-Builts and Infrastructure Asset Attributes
  5. This information shall be supplied in .pdf file format. 
  6. Council may request hardcopy paper copies where necessary. In general As-Built plans shall be supplied on A3 paper size. However, if required for clarity, larger paper sizes may be requested by Council

Confirmation from Councils Team Leader: Asset Information is required before providing As-Built information by this method. 

QA-6.4.2  Electronic: Survey and Software Produced

The following shall apply:

  1. This method is applicable to: 
    1. Subdivision Development Works Type 1 Asset Vesting Process (i.e. up to 3 independent dwelling units): Where more than just standard service connections are to be vested.
    2. Subdivision Development Works Type 2 Asset Vesting Process (i.e. Large scale subdivision, land use and 4 or more independent dwelling units).
    3. Council Capital Works.
    4. Council Maintenance Works: Where more than just standard service connections are constructed
    5. Any other works not mentioned above.
  2. Infrastructure shall be cadastral surveyed and this data processed and provided in accordance with acceptable software outputs.
  3. Asset information and attributes shall be provided as detailed in Councils guideline Electronic As-Builts and Infrastructure Asset Attributes.
  4. This information shall be supplied in .pdf file format. 
  5. Council may request hardcopy paper copies where necessary. In general As-Built plans shall be supplied on A3 paper size. However, if required for clarity, larger paper sizes may be requested by Council. 

Definitions in this section

As-built

Asset

Council

 

Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand  |  Terms of use