Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

QA-7.7 Landscaping: Maintenance Works Handover Fee

PreviousNext

This is a calculated fee that developers can pay as an option to hand over agreed maintenance requirements over to Council to manage. Developers are encouraged to consult with Councils Team Leader: Parks Maintenance to obtain approval for this handover method prior to Development Works Approval.
 
Application for this fee shall be made on form MF1 Maintenance Fee Form.
 

QA-7.7.1   Fee Period

The minimum fee period for a Landscaping: Maintenance Handover Fee is 12 months from the date of fee agreement. 
 

QA-7.7.2   Fee Value

Please refer to QA-7 Appendix C for calculation of the Landscaping: Maintenance Works Handover Fee value.
 
All applications include a non-refundable fee for administration of the application. The administration fee value is listed within Councils Fees and Charges Manual and shall be added to the fees for s224.  
 

QA-7.7.3   Deliverables

The applicant shall provide:
  1. A complete application on MF1 Maintenance Fee Form.
  2. A complete schedule of works and calculation on MF2 Maintenance Fee Form - Schedule of Works.
  3. Copies of any pre-agreement correspondence with Council made prior to the application.
  4. Any other information requested by Council to assist with the processing of the fee application.
All deliverables shall be provided to the Council Development Engineer assigned to the project.

Definitions in this section

Council

Development works approval

S224