Search
× Search
Menu
  1. Home
  2. General
  3. Infrastructure Development Processes
  4. Quality Assurance Information Requirements
    1. QA-1 Resource Consent Application Requirements
    2. QA-2 Works Undertaken By or For a Council
    3. QA-3 Development Works Approval
    4. QA-4 Survey Plan (s223) Approval
    5. QA-5 Final Sign Off (s224c) Application Requirements
    6. QA-6 As-Built Information
    7. QA-7 Bonds and Maintenance Fee
    8. QA-8 Building Consent Considerations
  5. Design Standards
    1. DS-1 General Provisions
    2. DS-2 Streetscape
    3. DS-3 Reserves
    4. DS-4 Transportation Network
    5. DS-5 Stormwater
    6. DS-6 Wastewater
    7. DS-7 Water Supply
    8. DS-8 Public Lighting
    9. DS-9 Network Utilities
    10. DS-10 Natural Hazards & Earthworks
    11. DS-11 Road Zone/Road Reserve Occupancy
    12. DS-12 Building Consent Considerations
  6. Standard Drawings
    1. SD-1 General Provisions
    2. Street design diagrams
    3. T100 Perspective Drawings
    4. T200 Streetscape
    5. T300 Reserves
    6. T400 Transport Network
    7. T500 Stormwater
    8. T600 Wastewater
    9. T700 Water Supply
    10. T800 Public Lighting
    11. AB As-Built Drawings
  7. Approved Materials
  8. Construction Standards
    1. CS-1 General
    2. CS-2 Site Clearance
    3. CS-3 Earthworks
    4. CS-4 Excavation
    5. CS-5 Excavation in Trench
    6. CS-6 Fill
    7. CS-7 Bedding & Backfill
    8. CS-8 Subsoil Drainage for Earthworks & Roads
    9. CS-9 Pipework
    10. CS-10 Pipe Fittings
    11. CS-11 Manholes & Rodding Eyes
    12. CS-12 Sumps
    13. CS-13 Trenchless Technology
    14. CS-14 Road Ripping
    15. CS-15 Road Pavement Layers
    16. CS-16 Kerb & Channel
    17. CS-17 Concrete Work
    18. CS-18 Carriageway Surfacing
    19. CS-19 Roadmarking
    20. CS-20 Berm Features
    21. CS-21 Street Structures
    22. CS-22 Road Maintenance
    23. CS-23 Grassing & Turfing
    24. CS-24 Vegetation Planting & Gardens
    25. CS-25 Reinstatement
  9. Inspection & Testing Requirements
    1. IT-1 General Provision
    2. IT-2 Streetscape
    3. IT-3 Reserves
    4. IT-4 Transportation Network
    5. IT-5 Stormwater
    6. IT-6 Wastewater
    7. IT-7 Water Supply
    8. IT-8 Public Lighting
    9. IT-9 Network Utilities
Infrastructure Development Code

SD-1 - Appendix A.1 - Drawing Schedule

PreviousNext

  1. Perspective Drawings (100 Series)

Drawing

No.

Drawing Title

Revision / Revision Date

T101 Secondary Arterial Road Zone: SA1 - Four Lanes / Solid Median / Positive Crossfall

July 2011

T102 Secondary Arterial Road Zone: SA2 - Two Lanes / Solid Median / Positive Crossfall July 2011
T103 Secondary Arterial Road Zone: SA3 - Four Lanes / Solid Median / Positive Crossfall July 2011
T104 Secondary Arterial Road Zone: SA4 - Two Lanes / Solid Median / Negative Crossfall July 2011
T105 Secondary Arterial Road Zone: SA5 - Two Lanes / Solid Median / Positive Crossfall July 2011
T106 Secondary Arterial Road Zone: SA6 - Two lanes / Painted Median / Positive Crossfall July 2011
T107 Collector Road Zone: CR1 - Four Lanes / Solid Median / Positive Crosssfall July 2011
T108 Collector Road Zone: CR2 - Two Lanes / Solid Median / Negative Crossfall July 2011
T109 Collector Road Zone: CR3 - Two Lanes / Solid Median / Positive Crossfall July 2011
T110 Collector Road Zone: CR4 - Two Lanes / Painted Median / Positive Crossfall July 2011
T111 Collector Road Zone: CR5 - Two Lanes / No Median / Positive Crossfall July 2011
T112

Commercial / Industrial Road Zone: CI1 - Two Lanes / No Median / Positive Crossfall

July 2011
T113 Commercial / Industrial Road Zone: CI2 - Service Lane July 2011
T114 Local Road Zone: LR1 - Two Lanes / Parking / Positive Crossfall July 2011
T115 Local Road Zone: LR2 - Two Lanes / No Median / Positive Crossfall July 2011
T116

Local Road Zone: LR3 - Two Lanes / No Median / Positive Crossfall

July 2011
T117 Local Road Zone: LR4 - One Lane / Parking July 2011
T118 Local Road Zone: LR5 - One Lane / Passing Lane July 2011
T119 Residential Service Lanes: SL1 & SL2 July 2011
T120 Rural Residential Road: RR1 - Type 1 July 2011
T121 Rural Residential Road: RR2 - Type 2 July 2011
T122 Underground Service Locations July 2011
T123 Pedestrian/Cycle Accessway July 2011
T124 Private Way: Serving 1-4 Independent Dwelling Units July 2011
T125 Private Way: Serving 5-12 Independent Dwelling Units July 2011
T126 Private Way: Rural July 2011
127 129 Unused Numbers - For Future Use  
T130 Tauriko Business Estate: Zone Interface July 2011
T131 Tauriko Business Estate: Visual Mitigation Buffer July 2011
T132 Tauriko Business Estate: 5m Planted Buffer Strip July 2011
T133 Tauriko Business Estate: Secondary Arterial Road July 2011
T134 Tauriko Business Estate: Collector Road Zone July 2011
T135 Tauriko Business Estate: Green Connector July 2011
T140 Waiakei: Secondary Arterial Road Zone July 2011

Definitions in this section

Private way

Road

Tauranga City Council, Private Bag 12022, Tauranga, 3143, New Zealand  |  Terms of use

Back To Top